Browse
Search
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 04-15-2025 Business Meeting
>
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 3:37:00 PM
Creation date
4/10/2025 3:11:40 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for April 15, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 04-15-2025 Business Meeting
Minutes 04-15-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-010-Fiscal Year 2024-25 Budget Amendment #8
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-011-Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-024-Purchase of Property for the Crisis Diversion Facility
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-025-CMAR Contact
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-026-Application for North Carolina Education Lottery Proceeds for Orange County Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-028-Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-013-Public Safety Telecommunicators Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br /> summary statement on the status of change orders for the Project inclusive of potential change <br /> orders, approved change order and rejected/voided change orders as well as change orders which <br /> require the Owner's immediate attention. The report shall contain a summary statement as to the <br /> status of shop drawings,submittals and RFI's for the Project inclusive of items requiring the Owner <br /> and/or the Project Designer's immediate attention. The report shall contain a summary statement as <br /> to the status of quality control/inspections for the Project including,but not limited to,number and <br /> type of inspections made, overall Project quality to date, and recommendations. Finally, subject to <br /> the requirements of any OCIP,the report shall include an accident report. <br /> 25.18. If the Work is behind schedule, the CMAR must immediately provide written report of such <br /> condition to the Owner and Project Designer and indicate in writing what measures are being taken <br /> to bring the Work back on schedule and ensure that the contract completion date is not exceeded.If <br /> the Work is greater than thirty (30) days behind schedule and no legitimate requests for time <br /> extensions are in process, then the CMAR shall prepare and submit to the Project Designer a <br /> recovery schedule for review and approval. Failure of the CMAR to abide by the directives in this <br /> paragraph will give the Owner cause to terminate the Contract and pursue any other legal remedies <br /> allowed it by law. <br /> SHOP DRAWINGS,SUBMITTALS, SAMPLES,DATA <br /> 25.19. The CMAR shall develop and implement a system for review, acceptance or rejection, and <br /> processing of all shop drawings and submittals, including the projected lead-time on the CPM <br /> schedule. The CMAR shall review this system with the Owner and the Project Designer,and obtain <br /> the Owner's approval prior to implementation. <br /> 25.20. Within 30 consecutive calendar days of the notice to proceed with each GMP, a schedule for <br /> anticipated submission of all shop drawings,product data, samples, and similar submittals shall be <br /> prepared by the CMAR and provided to the Project Designer. This schedule shall indicate the <br /> items, relevant specification sections, other related submittal data, and the date when these items <br /> will be furnished to the Project Designer. <br /> 25.21. The CMAR will be responsible for logging all shop drawings/submittals and stamping them <br /> reviewed and approved prior to submission to the Project Designer. The CMAR shall provide <br /> additional copies of any submittals or shop drawings requested by the Owner. The CMAR is to <br /> insure that shop drawing/submittal packages are submitted in an appropriate manner and, if not, <br /> return them to the Subcontractor for proper submission. <br /> 25.22. The CMAR shall be responsible for tracking and monitoring all shop drawings/submittals <br /> throughout construction until all shop drawings/submittals have been approved by the Project <br /> Designer and completion reported to the Owner. <br /> 25.23. The CMAR shall include shop drawings as an agenda item on all Owner meetings and advise the <br /> Owner immediately of any delays in the shop drawing and submittal process. <br /> 25.24. The CMAR shall develop a shop drawing and submittal aging report which is to be submitted to <br /> the Owner at each weekly progress meeting. <br /> 25.25. Approval of shop drawings by the Project Designer shall not be construed as relieving the CMAR <br /> from responsibility for compliance with the design or terms of the Contract Documents nor from <br /> responsibility of errors of any sort in the shop drawings, unless such error has been called to the <br /> attention of the Project Designer in separate writing by the CMAR. <br /> 26.SUBSTITUTION REQUESTS <br /> 26.1. The CMAR will be responsible for logging all substitution requests. The CMAR will be <br /> responsible for reviewing all substitution requests to insure that they are complete; and, if not, <br /> return them to the Subcontractor for proper submission. The CMAR will be responsible to review <br /> all substitution requests prior to submission to the Project Designer and the Owner.It is to be noted <br /> Page 29 of 52 <br /> Revised 12/24,4/25 <br />