Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 04-15-2025 Business Meeting
>
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 3:37:00 PM
Creation date
4/10/2025 3:11:40 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for April 15, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 04-15-2025 Business Meeting
Minutes 04-15-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-010-Fiscal Year 2024-25 Budget Amendment #8
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-011-Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-024-Purchase of Property for the Crisis Diversion Facility
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-025-CMAR Contact
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-026-Application for North Carolina Education Lottery Proceeds for Orange County Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-028-Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-013-Public Safety Telecommunicators Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br /> completion date. The CMAR shall furnish to the Owner various schedules and updates setting forth <br /> planned and completed progress of the Project broken down by the various divisions or parts of the <br /> Work and by calendar days. The CMAR shall ensure that all schedules are prepared and updated in <br /> strict conformance with the Owner's requirements for formatting of reports for the Owner. The <br /> CMAR shall keep the Owner, the Project Designer and all Subcontractors fully informed as to all <br /> changes and updates to the schedule. The CMAR shall ensure that all schedules are prepared and <br /> updated in strict conformance with the Owner's requirements and for provision of one inclusive <br /> schedule incorporating necessary lead times for actions required, by the Owner and regulatory <br /> agencies (including Orange County), by the Consultant, by the CMAR, and by utility companies <br /> providing services or relocating service lines and facilities, by all Subcontractors, and for <br /> significant General Condition's activities, including but not limited to agenda submittals, permit <br /> and approvals applications and review of interim and final plans,specifications and bid packages. <br /> 25.13. The CMAR shall schedule and preside over regular site coordination meetings with Subcontractors <br /> as conditions on the Project require, but at least weekly. In addition, the CMAR shall conduct <br /> weekly progress meetings and other meetings as may be directed by the Owner, at which <br /> Subcontractors, the Owner, the Project Designer, other designated representatives, and the CMAR <br /> can discuss jointly such matters as progress, scheduling, and construction-related problems. All <br /> Subcontractors shall be represented at these job progress conferences by both home office and <br /> Project personnel,unless specifically excused by both the CMAR and the Owner. The CMAR shall <br /> require attendance from other subcontractors and material suppliers who can contribute toward <br /> maintaining required job progress. It shall be the principal purpose of these meetings, or <br /> conferences, to effect coordination, cooperation and assistance in every practical way toward the <br /> end of maintaining progress of the Project on schedule and to complete the Project within the <br /> specified contract time. The CMAR shall be prepared to assess progress of the Work and to <br /> recommend remedial measures for correction of progress as may be appropriate. The CMAR with <br /> assistance from the Project Designer shall be the coordinator of the conferences and shall preside as <br /> chairman. The CMAR shall take and distribute complete minutes of meetings to all attendees and <br /> others as directed by the Owner within three (3) days of such meetings. Representatives of the <br /> Owner may attend any or all meetings and shall in any case receive all notices and minutes of <br /> meetings. <br /> 25.14. The CMAR shall keep accurate and detailed written records of Project progress during all stages of <br /> construction. The CMAR shall maintain a detailed daily diary of all events, which occur at the <br /> jobsite or elsewhere, and which affect, or may be expected to affect, Project progress. The diary <br /> shall record weather data, including minimum and maximum temperatures, precipitation type and <br /> amount, sky conditions, and wind velocities. The diary shall also record all visitors, and include a <br /> detailed list of all material deliveries to the site. The diary shall be available to the Owner at all <br /> times and shall be turned over to the Owner upon completion of the Contract. <br /> 25.15. The CMAR shall compile and submit to the Owner daily a summary report consisting of the <br /> CMAR's Daily Diary and each Subcontractor's daily report describing the construction activities of <br /> the day along with manpower and equipment usage,including that of the Subcontractors. <br /> 25.16. The CMAR shall submit to the Owner and the Project Designer a weekly report of the status of all <br /> Work activities. The CMAR is to submit and conform the report format to the Owner's <br /> requirements for these reports and prior to implementation the CMAR must obtain the Owner's <br /> approval of the format. The Owner shall have no duty to respond to any information in the periodic <br /> reports, unless the CMAR specifically requests a response or action by the Owner in writing in a <br /> separate document. <br /> 25.17. The weekly status report shall show the actual Work completed to date in comparison with the <br /> original amount of Work scheduled, inclusive of information on the Subcontractors' Work and the <br /> percentage of completion for the Project. The report shall describe major milestones achieved and <br /> slipped, including a discussion of each slippage. In addition to schedule information, the report <br /> shall contain an overall summary of the financial status of the Project with a cost control report <br /> with proposed solutions for resolution of any cost concerns or issues. The report shall contain a <br /> Page 28 of 52 <br /> Revised 12/24,4/25 <br />