Browse
Search
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 04-15-2025 Business Meeting
>
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 3:37:00 PM
Creation date
4/10/2025 3:11:40 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for April 15, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 04-15-2025 Business Meeting
Minutes 04-15-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-010-Fiscal Year 2024-25 Budget Amendment #8
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-011-Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-024-Purchase of Property for the Crisis Diversion Facility
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-025-CMAR Contact
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-026-Application for North Carolina Education Lottery Proceeds for Orange County Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-028-Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-013-Public Safety Telecommunicators Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 <br /> 24.8.2. In addition to the foregoing daily liquidated damages, the CMAR shall pay as Event <br /> Liquidated Damages an additional one-time charge of $ for failure to complete <br /> substantial completion and beneficial occupancy for lad in and setup for a scheduled <br /> event by pm on <br /> 24.9. In addition to the foregoing liquidated damages,the Owner may recover extended utility charges as <br /> expressly set forth elsewhere in this Contract. <br /> 24.10. The CMAR shall not use its unexpended GMP Contingency to pay liquidated damages. The <br /> CMAR may in its discretion provide in its construction contracts that its Subcontractors will be <br /> liable for liquidated delay damages, in the amount of the Owner's liquidated damages or in <br /> different amounts. Notwithstanding anything in this Contract that might be construed to the <br /> contrary, in the event the CMAR deducts liquidated damages from a particular construction <br /> contract,thereby reducing the sum payable under that contract,the GMP will not be reduced by the <br /> amount withheld from that Subcontractor. <br /> 24.11. Other than extended utility charges, liquidated damages shall be Owner's sole remedy for delay or <br /> inability to use the Project or any portion thereof. This provision for liquidated damages does not <br /> bar Owner's right to enforce its other contractual rights and remedies under this Contract,including <br /> without limitation the right to order the CMAR to accelerate the Work or the right to terminate the <br /> Contract. Liquidated damages represent the Owner's best effort at the commencement of the <br /> Contract to estimate its reasonable anticipated damages for delay, and should not be construed as a <br /> penalty. <br /> 25.CONSTRUCTION SUPERVISION AND SCHEDULE <br /> 25.1. The CMAR shall maintain a competent and adequate full-time staff approved by the Owner at the <br /> Project site to coordinate and provide adequate direction of the Work, and to monitor progress of <br /> the Subcontractors on the Project at all times. The CMAR's on-site representatives shall manage <br /> the Work of the Subcontractors and coordinate the Work with the activities and responsibilities of <br /> the Owner, Project Designer and CMAR to complete the Project in accordance with the Owner's <br /> objectives of cost,time and quality. <br /> 25.2. It is understood that the designated and approved on-site resident CMAR representatives will <br /> remain on the job and in responsible charge as long as those persons remain employed by the <br /> CMAR, unless the Owner's Representative agrees otherwise in writing during the course of the <br /> Project.A contract amendment may be required by the Owner's Representative issued accordingly <br /> by the Owner. The Owner may request in writing that the CMAR promptly remove any individual <br /> staff member for any reason. <br /> 25.3. The CMAR shall establish an on-site organization and lines of authority in order to carry out the <br /> overall plans of the Project Team. The CMAR will provide for all coordination with the on-site <br /> Subcontractors the necessary on-site services for the construction activities and on-site <br /> requirements of the CMAR,Owner and Project Designer. <br /> 25.4. The CMAR shall accept delivery and arrange for storage, protection and security for any Owner <br /> purchased materials, systems and equipment that are a part of the Work until such items are turned <br /> over to the respective Subcontractors. <br /> 25.5. The CMAR shall provide a critical path method ("CPM") schedule utilizing accepted standard <br /> computer based software. The scheduling software shall allow for integration of all aspects of the <br /> Project and provide for coordination of all Work to be performed. The scheduling software used by <br /> the CMAR shall be capable of producing and coordinating logic developed network diagrams, and <br /> tabular format reports. <br /> 25.6. After acceptance of each GMP and issuance of a construction contract amendment to the CMAR <br /> for a Construction Phase of the Project and within fifteen (15) days of written notice to proceed <br /> Page 26 of 52 <br /> Revised 12/24,4/25 <br />