Browse
Search
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 04-15-2025 Business Meeting
>
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 3:37:00 PM
Creation date
4/10/2025 3:11:40 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for April 15, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 04-15-2025 Business Meeting
Minutes 04-15-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-010-Fiscal Year 2024-25 Budget Amendment #8
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-011-Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-024-Purchase of Property for the Crisis Diversion Facility
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-025-CMAR Contact
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-026-Application for North Carolina Education Lottery Proceeds for Orange County Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-028-Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-013-Public Safety Telecommunicators Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> 24.1.15. CMAR submits GMP#4 to Owner <br /> 24.1.16.Board approval of GMP#4 <br /> 24.1.17.GMP#5 Design Package Completion <br /> 24.1.18. CMAR submits GMP#5 to Owner <br /> 24.1.19.Presentation of Construction Documents <br /> 24.1.20.Board approval of GMP#5 <br /> 24.1.21. Substantial Completion—Move In <br /> 24.1.22.Punch List Completion <br /> 24.1.23.Project Final Completion <br /> 24.1.24.Completion of Closeout and Warranty <br /> 24.2. The Project shall be brought to Substantial and Final Completion within the time prescribed by the <br /> Project schedule that is updated and established at the time the final GMP is accepted,which shall <br /> be in accord with the foregoing target schedule as extended by the Owner by change order in <br /> accordance with the Contract. <br /> 24.3. If the CMAR is delayed at any time in the progress of its Work by any act or negligence of the <br /> Owner or the Project Designer, or Owner's Separate Contractor(s), or by any employee of either; <br /> by changes ordered in the Work; by any event covered under the builders risk"all risk"policy,by <br /> labor disputes at the Project site;by abnormal weather conditions not reasonably anticipated for the <br /> locality where the Work is performed;by unavoidable casualties; by public health crises including <br /> pandemics/epidemics and governmental actions in response thereto; any causes beyond the <br /> CMAR's control; or by any other causes which the Project Designer and Owner determine may <br /> justify the delay, then the contract time may be extended by change order for the time which the <br /> Project Designer and Owner may determine is reasonable and the Guaranteed Maximum Price <br /> equitably adjusted accordingly by Change Order. Contract defaults or other breaches of any legal <br /> duty by a Subcontractor shall not be grounds for a time extension under this Contract. Time <br /> extensions will not be granted for rain,wind, snow or other natural phenomena of normal intensity <br /> for the locality where Work is performed. For purpose of determining the extent of delay <br /> attributable to unusual weather phenomena, a determination shall be made by comparing the <br /> weather for the contract period involved with the average of the preceding twenty (20) year <br /> climatic range during the same time interval based on the National Oceanic and Atmospheric <br /> Administration National Weather Service statistics for the locality where Work is performed and on <br /> daily weather logs kept on the job site by the CMAR reflecting the effect of the weather on <br /> progress of the Work and initialed by the Project Designer. Time extensions for weather delays <br /> shall not entitle the CMAR to an increase in the GMP. <br /> 24.4. It is the CMAR's responsibility to meet the required construction completion dates, as extended by <br /> the Owner in accordance with the Contract. As an inducement to the CMAR to meet the required <br /> substantial completion date for the Project, the Owner will include in the Total Construction <br /> Budget an Early Completion Bonus Fund amount of one percent(1.0%)of the actual Project GMP, <br /> which shall be payable to the CMAR as an Early Completion Bonus if the Project is completed <br /> prior to the substantial completion date, as extended in accordance with this Contract and further <br /> provided that the Project is completed under budget and so long as including payment of the Early <br /> Completion Bonus Fund does not result in an amount that exceeds the Total Construction Budget. <br /> Page 24 of 52 <br /> Revised 12/24,4/25 <br />