Browse
Search
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 04-15-2025 Business Meeting
>
Agenda - 04-15-2025; 6-c - Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 3:37:00 PM
Creation date
4/10/2025 3:11:40 PM
Metadata
Fields
Template:
BOCC
Date
4/15/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for April 15, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 04-15-2025 Business Meeting
Minutes 04-15-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-010-Fiscal Year 2024-25 Budget Amendment #8
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-011-Approval of a Contract with Gilbane for Construction Manager-At-Risk Services for the Crisis Diversion Facility and Approval of Budget Amendment #8-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-024-Purchase of Property for the Crisis Diversion Facility
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-025-CMAR Contact
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-026-Application for North Carolina Education Lottery Proceeds for Orange County Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-028-Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal Schools (OCS) to Drawdown Funds from the North Carolina Department of Public Instruction
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-013-Public Safety Telecommunicators Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> operations are creating dust in excess of what would be considered normal if the building <br /> were occupied. <br /> 19.8.4. It shall be understood that any warranty on equipment presented to the Owner shall <br /> extend from the earlier of substantial completion or occupancy by the Owner. The cost of <br /> maintaining the equipment during operation in the finishing stages of construction shall <br /> be borne by the Subcontractor whose system is utilized. <br /> 19.8.5. The CMAR shall ensure that all lamps are in proper working condition at the time of final <br /> Project acceptance. <br /> 19.9. The CMAR shall provide, if required and where directed, a shed for toilet facilities and <br /> shall furnish and install in its shed all water closets required for a complete and adequate <br /> sanitary arrangement. These facilities will be available to other Subcontractors on the job <br /> and shall be kept in a neat and sanitary condition at all times. Chemical toilets are <br /> acceptable. <br /> 19.10. The CMAR shall, if needed and where directed by the Owner's Representative, erect a <br /> temporary field office, complete with lights, telephone, heat and air conditioning. A <br /> portion of this office shall be partitioned off, of sufficient size, for the use of the Project <br /> Designer,should the Owner's Representative so direct. <br /> 19.11. The CMAR is responsible for making temporary elevators, lifts, or other special <br /> equipment available for the general use of all Subcontractors but also may require such <br /> Subcontractors to execute CMAR's required form of release and indemnity agreement. <br /> The cost for such elevators, lifts or other special equipment and the safe and efficient <br /> operation thereof may be included in the CMAR's General Conditions. <br /> 19.12. The CMAR will erect one sign on the Project, and may erect others if approved by the <br /> Owner's Representative. The sign(s) shall be of sound construction, and shall be neatly <br /> lettered. The sign(s) shall bear the name or logos approved by the Owner's <br /> Representative of participants on the Project,and the CMAR's name,and the name of the <br /> Project Designer and consultants. Directional signs may be erected on the Owner's <br /> property subject to approval of the Owner with respect to size, style and location of such <br /> directional signs. Such signs may bear the name of the CMAR and a directional symbol. <br /> All signs must comply with all local sign, appearance, and traffic ordinances. No other <br /> signs will be permitted except by permission of the Owner's Representative. <br /> 20.CLEANING UP <br /> 20.1. The CMAR shall ensure that the building and surrounding area is reasonably free from rubbish at <br /> all times, and shall remove debris from the site on a timely basis or when directed to do so by the <br /> Owner's Representative. The CMAR shall provide an on-site refuse container(s) for the use of all <br /> Subcontractors. The CMAR shall ensure that each Subcontractor removes their rubbish and debris <br /> from the building on a daily basis. The CMAR shall ensure that the building is broom cleaned as <br /> required to minimize dust and dirt accumulation. <br /> 20.2. The CMAR shall provide and maintain suitable all-weather access to the construction site and all <br /> buildings. <br /> 20.3. Before final inspection and acceptance of the building, the CMAR shall ensure that all portions of <br /> the Work are clean, including glass, hardware, fixtures, masonry, tile and marble (using no acid). <br /> The CMAR shall clean and wax all floors as specified, and completely prepare the building for use <br /> by the Owner,with no cleaning required by the Owner. <br /> Page 19 of 52 <br /> Revised 12/24,4/25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.