Orange County NC Website
61 <br /> REQUEST# FY 2026 FY START DATE <br /> Orange Transit Work Plan Jul 2025 <br /> 4- 26TOCCDI Request Form Total Project Cost <br /> Operating and/or Capital $ 276,194 <br /> Orange Transit Estimated <br /> Project Name Requesting Agency Project Contact Operating Cost <br /> Base Year $ - <br /> 203 Connector Sidewalk Town of Carrboro Tina Moon FY 2027 $ - <br /> cmoon carrboronc. oy Cumulative $ - <br /> Estimated Orange Transit Estimated Capital <br /> Estimated Start Date Completion Notes Cost <br /> Jul-25 Jun-27 Base Year $ 120,283 <br /> Cumulative $ 276,194 <br /> Project Enter below a summary of the project that may later be used as the project description in <br /> Description/Scope the FY 2026 Work Plan. <br /> Design and construct a 6-foot wide meandering sidewalk to connect the new Drakeford Library Complex(203 South <br /> Green/Roberson St)to East Main St, and construct a new bus shelter pad at East Main as part of the installation of new <br /> enhanced bus shelters for Chapel Hill Transit and GoTriangle (405 to Durham). <br />