Orange County NC Website
52 <br /> REQUEST# FY 2026 FY START DATE <br /> Orange Transit Work Plan Mar 2022 <br /> 18TOCCD5 Request Form Total Project Cost <br /> Operating and/or Capital $ 180,112 <br /> Orange Transit Estimated Operating <br /> Project Name Requesting Agency Project Contact Cost <br /> Base Year $ - <br /> South Greensboro <br /> Street Sidewalk Town of Carrboro Tina Moon FY 2027 $ - <br /> cmoon carrboronc. ov Cumulative $ <br /> Estimated <br /> Estimated Start Date Completion Notes Orange Transit Estimated Capital Cost <br /> Mar-20 Jun-28 Base Year $ 180,112 <br /> Cumulative $ 180,112 <br /> Project Enter below a summary of the project that may later be used as the project description in <br /> Description/Scope the FY 2026 Work Plan. <br /> Design and installation of sidewalk along one side of South Greensboro Street from north end of Old Pittsboro Road to <br /> Public Works Drive, appropriately 0.9 miles. (TIP#C-5650). Project includes replacing an existing 6-inch waterline, <br /> resurfacing South Greensboro Street from Main Street to Smith Level Road bridge, and lane narrowing to add bike lanes <br /> along the southern segment of corridor. Transit access and transit stops along the corridor will be improved (3 along <br /> corridor and 5 in close proximity). <br />