Orange County NC Website
51 <br /> REQUEST# FY 2026 FY START DATE <br /> Orange Transit Work Plan Mar 2022 <br /> 18TOCCD04 Request Form Total Project Cost <br /> Operating and/or Capital $ 254,608 <br /> Orange Transit Estimated Operating <br /> Project Name Requesting Agency Project Contact Cost <br /> Base Year $ - <br /> Morgan Creek <br /> Town of Carrboro Tina Moon FY 2026 $ - <br /> Greenway <br /> cmoon carrboronc. ov Cumulative $ - <br /> Estimated <br /> Estimated Start Date Completion Notes Orange Transit Estimated Capital Cost <br /> Mar-22 Mar-27 Base Year $ 254,608 <br /> Cumulative $ 254,608 <br /> Project Enter below a summary of the project that may later be used as the project description in <br /> Description/Scope the FY 2026 Work Plan. <br /> This is the first phase of a greenway system that will ultimately connect Smith Level Road to University Lake with a <br /> potential spur to Carrboro High School. <br /> Phase 1 begins at the Smith Level Road bridge and extends west along the north side of Morgan Creek,with a spur to <br /> Abbey Road,to a pedestrian bridge crossing Morgan Creek to the south side of the creek and on to a terminus point <br /> near an existing informal pedestrian network in the woods; a total of approximately 1850 linear feet. <br />