Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Meeting Minutes <br />PDC 23022 2 <br /> <br /> <br />• Any roofing work will need to be performed by a roofing contractor authorized by the roofing manufacturer <br />holding the warranty on the roof to maintain the warranty. This information will be provided in an <br />addendum. <br /> <br />Project & Timeline: <br />• Existing units must stay operational until new units are in the contractor’s possession and ready to install. <br />• Include a $25,000 allowance with your bid <br />• Project duration is set at 250 days from Notice to Proceed. Based on equipment lead times, this may be <br />extended at the Engineer’s discretion via a no-cost change order. <br />• $1,000/day liquidated damages <br />• Sales Tax forms are included in the bid package and will be required with each monthly pay application. <br />• Make sure you are familiar with the General and Supplementary Conditions. <br />• All work must be inspected by PDC and the Local Inspector. <br />• The Owner has hired a third-party Commissioning Agent to oversee commissioning of the new unit. The <br />contractor’s bid should include labor, materials, and time for the third-party commissioning process, <br />including, but not limited to, filling out pre-functional test forms, attending separate commissioning <br />meetings, and facilitating functional performance testing. <br /> <br />Additional Documents: <br />• Complete plans and specifications for this project can be obtained from Progressive Design Collaborative <br />at sgado@pdcengineers.com. <br /> <br />We believe the foregoing to be an accurate summary of discussions and related decisions. We would appreciate formal, written notification of <br />exceptions to this record within seven (7) days of its release. Failing such notification, we will consider these minutes a matter of record. <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.