Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />pdcengineers.com <br /> <br /> <br /> <br />ADDENDUM 01 – GENERAL <br /> <br />DATE: December 19, 2024 <br /> <br />PROJECT: Orange County Sportsplex Pool HVAC Unit <br /> PDC Project No. 23022 <br /> <br />This Addendum, applicable to the work designed below, shall be understood to be and is a change to the bid <br />documents and shall be part of and included in the contract for the above referenced project. All General, <br />Supplementary and Special Conditions, etc., as originally specified or as modified below shall apply to these items. <br /> <br /> <br />1. Refer to enclosed sign-in sheet for Pre-Bid meeting attendance. <br />2. Refer to enclosed MEETING MINUTES from Pre-Bid meeting. <br />3. The facility will be available for additional site visits on December 23, and December 30, at 10AM. <br />4. Emailed bids will NOT be accepted. All bids must be hand delivered in physical envelopes. Refer to <br />specification section 00 11 13 – Advertisement for Bids for information. <br />5. It is anticipated that the Crane lift will occur during normal 9AM-5PM hours and the Owner will coordinate <br />evacuating the portions of the facility affected during that time. <br />6. The roof is currently under warranty: <br />Bar Roofing and Maintenance, LLC <br />Nathan Darrah <br />1313 S. Park Drive <br />Kernersville, NC 27284 <br />336.782.7108 <br />nathan.barrfg@gmail.com <br /> <br />7. Liquidated Damages will be $1,000.00 per day. <br />8. The project duration will be set for 250 days from the Notice to Proceed. The Engineer and Owner <br />reserve the right to issue a no cost change order to extend this based on equipment lead times. <br />9. It is assumed that the new unit will be provided with a roof curb adapter to interface with the existing roof <br />curb. If the successful contractor bids a unit that differs significantly in physical dimensions or weight from <br />the existing unit and requires roofing or structural reinforcement beyond simply installing a roof curb <br />adapter, the contractor shall be responsible for these costs, including any structural engineering required. <br /> <br /> <br />END OF ADDENDUM 01 – GENERAL <br /> <br />Attachments: See list above <br /> <br /> <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.