Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Conduit for Electrical Systems 26 05 33.13 - 7 <br />2.Where conduits pass from unconditioned interior spaces into conditioned interior spaces. <br />3.Where conduits penetrate coolers or freezers. <br />O.Provide 200 pound tensile strength pull string in all empty conduits and in conduits where <br />conductors and cables are to be installed by others.Leave minimum slack of 12 inches at each <br />end.All empty conduits shall terminate in a junction box. <br />P.All ducts shall be sealed at terminations,using sealing compound and plugs,as required to <br />withstand 15 psi minimum hydrostatic pressure. <br />6.03 FIELD QUALITY CONTROL <br />A.Repair cuts and abrasions in galvanized finishes using zinc-rich paint recommended by <br />manufacturer.Replace components that exhibit signs of corrosion. <br />B.Where coating of PVC-coated galvanized steel rigid metal conduit (RMC)contains cuts or <br />abrasions,repair in accordance with manufacturer's instructions. <br />C.Correct deficiencies and replace damaged or defective conduits. <br />6.04 CLEANING <br />A.Clean interior of conduits to remove moisture and foreign matter. <br />6.05 PROTECTION <br />A.Immediately after installation of conduit,use suitable manufactured plugs to provide protection <br />from entry of moisture and foreign material and do not remove until ready for installation of <br />conductors. <br />END OF SECTION 26 05 33.13 <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.