Orange County NC Website
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 HVAC Water Treatment 23 25 00 - 6 <br />B.Conduct final on-site system turn over meeting with Owner and Commissioner. Present final <br />validation report demonstrating that performance requirements have been achieved and that each <br />system is currently properly treated. <br />C.Written completeness certification and applicable reports will be forwarded to the project Engineer <br />prior to acceptance. <br />3.07 MAINTENANCE <br />A.Provide service and maintenance of treatment systems for one year from Date of Substantial <br />Completion. <br />B.Provide monthly technical service visits to perform field inspections and make water analysis on- <br />site. Detail findings in writing on proper practices,chemical treating requirements,and corrective <br />actions needed. Submit two copies of field service report after each visit. <br />C.Provide laboratory and technical assistance services during this maintenance period. <br />D.Provide on-site inspections of equipment during scheduled or emergency shutdown to properly <br />evaluate success of water treatment program,and make recommendations in writing based upon <br />these inspections. <br />END OF SECTION 23 25 00 <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C