OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 HVAC Water Treatment 23 25 00 - 5 <br />G.Inspect,remove sludge,and flush low points with clean water after cleaning process is completed. <br /> Include disassembly of components as required. <br />H.After the pre-cleaning is complete,test by the water treatment consultant shall confirm and a <br />written report shall certify the completeness of the pre-cleaning by meeting the following minimum <br />requirements: <br />1.Total Iron as Fe shall be equal to or less than 0.5 ppm. <br />2.pH shall be equal to or less than 9.0. <br />3.TDS shall be equal to or less than 10%above clean water. <br />3.03 EXISTING SYSTEMS <br />A.When connecting into active existing systems,treat piping networks installed or reused by the <br />project and verify by lab analysis that the treatment levels per the treatment plan have been <br />attained. Submit validating report for approval. <br />B.Provide temporary valves,piping,and accessories to isolate the new piping from the existing and <br />treat the project’s piping prior to connection to the active system. <br />3.04 INSTALLATION <br />A.Install in accordance with manufacturer's instructions. <br />B.Contractor shall install a BYPASS pipe wherever needed between the hydronic return &supply <br />lines to recirculate the entire system using the hydronic pumps installed.The diameter of this pipe <br />shall be at least 1/3 of the diameter of the main hydronic lines.The contractor shall also remove or <br />cap the temporary BYPASS to a permanent configuration when flushing is complete and approved <br />water chemistry is achieved. <br />C.Contractor shall remove all strainer screens prior to flushing all systems,including mud from the <br />dirt legs.Contractor shall clean and replace/reinstall all strainer screens after the final cleaning and <br />flushing procedure has passed the final test criteria noted herein. <br />D.Complete circulation must be achieved during the cleaning procedure.The Contractor shall <br />develop a plan to achieve a minimum velocity of three feet per second (3 ft/s)in the pipes to <br />ensure the cleaning chemicals will work properly.If necessary,isolate parts of the piping system to <br />attain at least (3 ft/s)in piping being flushed.All electric,pneumatic,and thermostatic operated <br />valves shall be full open.All deadend runs shall be looped together with piping not less than one- <br />third the size of the run. <br />3.05 CLOSED SYSTEM TREATMENT <br />A.Provide passivation/chemical treatment at system startup or immediately upon operation of a <br />system for temporary cooling and heating,whichever comes first. <br />B.Provide chemical treatment immediately after each system has been cleaned and <br />flushed. Thereafter immediately begin the approved water treatment maintenance program to <br />passivate and prevent corrosion,scale,and organic growth and to maintain treatment chemical <br />levels. Note that systems or parts of systems will not typically be started at the same time;adjust <br />treatment strategy accordingly. <br />C.Provide chemicals that comply with State and Federal regulations. <br />D.Provide one bypass feeder on each system. Install isolating and drain valves and necessary <br />piping. Install around balancing valve downstream of circulating pumps unless indicated <br />otherwise. <br />E.Introduce closed system treatment through bypass feeder when required or indicated by test. <br />F.Provide ​3/4 inch​water coupon rack around circulating pumps with space for ​12​test specimens. <br />3.06 CLOSEOUT ACTIVITIES <br />A.Training: Train Owner's personnel on operation and maintenance of chemical treatment system. <br />1.Provide minimum of ​four hours​of instruction for ​two people​. <br />2.Have operation and maintenance data prepared and available for review during training. <br />3.Conduct training using actual equipment after treated system has been put into full operation. <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C