Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Refrigerant Piping 23 23 00 - 1 <br />SECTION 23 23 00 <br />REFRIGERANT PIPING <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Piping. <br />B.Moisture and liquid indicators. <br />C.Valves. <br />D.Strainers. <br />E.Check valves. <br />F.Filter-driers. <br />G.Flexible connections. <br />H.Exterior penetration accessories. <br />1.02 REFERENCE STANDARDS <br />A.ASME BPVC-IX -Boiler and Pressure Vessel Code,Section IX -Qualification Standard for <br />Welding,Brazing,and Fusing Procedures;Welders;Brazers;and Welding,Brazing,and Fusing <br />Operators;2021. <br />B.ASME B16.22 -Wrought Copper and Copper Alloy Solder-Joint Pressure Fittings;2021. <br />C.ASME B31.5 -Refrigeration Piping and Heat Transfer Components;2022. <br />D.ASME B31.9 -Building Services Piping;2020. <br />E.ASTM A123/A123M -Standard Specification for Zinc (Hot-Dip Galvanized)Coatings on Iron and <br />Steel Products;2017. <br />F.AWS A5.8M/A5.8 -Specification for Filler Metals for Brazing and Braze Welding;2019. <br />G.MSS SP-58 -Pipe Hangers and Supports -Materials,Design,Manufacture,Selection,Application, <br />and Installation;2018,with Amendment (2019). <br />1.03 SUBMITTALS <br />A.Product Data: Provide general assembly of specialties,including manufacturer's catalogue <br />information.Provide manufacturer's catalog data including load capacity. <br />B.Shop Drawings: Indicate schematic layout of system,including equipment,critical dimensions, <br />and sizes. <br />C.Design Data: Submit design data indicating pipe sizing.Indicate load-carrying capacity of trapeze, <br />multiple pipe,and riser support hangers. <br />1.04 DELIVERY,STORAGE,AND HANDLING <br />A.Deliver and store piping and specialties in shipping containers with labeling in place. <br />B.Protect piping and specialties from entry of contaminating material by leaving end caps and plugs <br />in place until installation. <br />C.Dehydrate and charge components such as piping and receivers,seal prior to shipment,until <br />connected into system. <br />PART 2 PRODUCTS <br />2.01 SYSTEM DESCRIPTION <br />A.Filter-Driers: <br />1.Use a filter-drier immediately ahead of liquid-line controls,such as thermostatic expansion <br />valves,solenoid valves,and moisture indicators. <br />2.02 REGULATORY REQUIREMENTS <br />A.Comply with ASME B31.9 for installation of piping system. <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.