Orange County NC Website
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Commissioning of HVAC 23 08 00 - 2 <br />b.Room number. <br />c.Room name. <br />d.Air handler unit ID. <br />e.Reference drawing number. <br />f.Air terminal unit tag ID. <br />g.Heating and/or cooling valve tag ID. <br />h.Minimum air flow rate. <br />i.Maximum air flow rate. <br />5.Full print out of all schedules and set points after testing and acceptance of the system. <br />6.Full as-built print out of software program. <br />7.Electronic copy on disk of the entire program for this facility. <br />8.Marking of all system sensors and thermostats on the as-built floor plan and HVAC drawings <br />with their control system designations. <br />9.Maintenance instructions,including sensor calibration requirements and methods by sensor <br />type,etc. <br />10.Control equipment component submittals,parts lists,etc. <br />11.Warranty requirements. <br />12.Copies of all checkout tests and calibrations performed by the Contractor (not commissioning <br />tests). <br />13.Organize and subdivide the manual with permanently labeled tabs for each of the following <br />data in the given order: <br />a.Sequences of operation. <br />b.Control drawings. <br />c.Points lists. <br />d.Controller and/or module data. <br />e.Thermostats and timers. <br />f.Sensors and DP switches. <br />g.Valves and valve actuators. <br />h.Dampers and damper actuators. <br />i.Program setups (software program printouts). <br />D.Project Record Documents: See Section 01 78 00 for additional requirements. <br />1.Submit updated version of control system documentation,for inclusion with operation and <br />maintenance data. <br />2.Show actual locations of all static and differential pressure sensors (air,water and building <br />pressure)and air-flow stations on project record drawings. <br />E.Draft Training Plan: In addition to requirements specified in Section 01 79 00,include: <br />1.Follow the recommendations of ASHRAE Guideline 1.1. <br />2.Control system manufacturer's recommended training. <br />3.Demonstration and instruction on function and overrides of any local packaged controls not <br />controlled by the HVAC control system. <br />F.Training Manuals: Refer to Division 01 requirements <br />1.Provide three extra copies of the controls training manuals in a separate manual from the <br />O&M manuals. <br />PART 2 PRODUCTS <br />2.01 TEST EQUIPMENT <br />A.Provide all standard testing equipment required to perform startup and initial checkout and <br />required functional performance testing;unless otherwise noted such testing equipment will NOT <br />become the property of Owner. <br />B.Equipment-Specific Tools: Where special testing equipment,tools and instruments are specific to <br />a piece of equipment,are only available from the vendor,and are required in order to accomplish <br />startup or Functional Testing,provide such equipment,tools,and instruments as part of the work <br />at no extra cost to Owner;such equipment,tools,and instruments are to become the property of <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C