Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Testing,Adjusting,and Balancing for <br />HVAC 23 05 93 - 11 <br />3.Model number. <br />4.Air flow,specified and actual. <br />5.Return air flow,specified and actual. <br />6.Outside air flow,specified and actual. <br />7.Total static pressure (total external),specified and actual. <br />8.Inlet pressure. <br />9.Discharge pressure. <br />10.Fan RPM. <br />I.Exhaust Fans: <br />1.Location. <br />2.Manufacturer. <br />3.Model number. <br />4.Air flow,specified and actual. <br />5.Total static pressure (total external),specified and actual. <br />6.Inlet pressure. <br />7.Discharge pressure. <br />8.Fan RPM. <br />J.Duct Traverses: <br />1.System zone/branch. <br />2.Duct size. <br />3.Design air flow. <br />4.Test velocity. <br />5.Test air flow. <br />6.Duct static pressure. <br />7.Air temperature. <br />K.Flow Measuring Stations: <br />1.Identification/number. <br />2.Location. <br />3.Size. <br />4.Manufacturer. <br />5.Model number. <br />6.Design Flow rate. <br />7.Design pressure drop. <br />8.Actual/final pressure drop. <br />9.Actual/final flow rate. <br />L.Air Distribution Tests: <br />1.Air terminal number. <br />2.Room number/location. <br />3.Terminal type. <br />4.Terminal size. <br />5.Design air flow. <br />6.Test (final)air flow. <br />7.Percent of design air flow. <br />END OF SECTION 23 05 93 <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.