Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Testing,Adjusting,and Balancing for <br />HVAC 23 05 93 - 8 <br />F.Where available pump capacity is less than total flow requirements or individual system parts,full <br />flow in one part may be simulated by temporary restriction of flow to other parts. <br />G.The TAB report shall indicate the critical circuit,which coils were closed for diversity (if applicable), <br />and how the differential pressure setpoint was established. <br />3.10 CRITICAL FLOW PATH <br />A.Provide a documented critical path for all fluid flows.There shall be at least one terminal device <br />that can be traced back to the fan or pump where there is no damper or valves that are less than <br />100%open. <br />3.11 DEMONSTRATION <br />A.Training <br />1.Train the Owner's maintenance personnel on troubleshooting procedures and testing, <br />adjusting,and balancing procedures.Provide four (4)hours on site training.Review with the <br />Owner's personnel the information contained in the Operating and Maintenance Data <br />specified in Division 1 and Section 23 01 00. <br />2.Schedule training with the Owner through the Engineer with at least 7 days prior notice. <br />3.12 COMMISSIONING <br />A.Perform prerequisites prior to starting commissioning activities. <br />B.Fill out Prefunctional Checklists for: <br />1.Air side systems. <br />2.Water side systems. <br />C.Furnish to the Commissioning Authority,upon request,any data gathered but not shown in the <br />final TAB report. <br />D.Re-checkminimum outdoor air intake flows and maximum and intermediate total airflow rates for <br />50 percent of the air handlers plusa random sample equivalent to 50percent of the final TAB <br />report data as directed by Commissioning Authority. <br />1.Original TAB agency shall execute the re-checks,witnessed by the Commissioning Authority. <br /> <br />2.Use the same test instruments as used in the original TAB work. <br />3.Failure of more than 25of the re-checked items of a given system shall result in the rejection <br />of the system TAB report;rebalance the system,provide a new system TAB report,and <br />repeat random re-checks. <br />4.For purposes of re-check,failure is defined as follows: <br />a.Air Flow of Supply and Return: Deviation of more than 10 percent of instrument reading. <br />b.Minimum Outside Air Flow: Deviation of more than 20 percent of instrument reading;for <br />inlet vane or VFD OSA compensation system using linear proportional control,deviation <br />of more than 30 percent at intermediate supply flow. <br />c.Temperatures: Deviation of more than one degree F. <br />d.Air and Water Pressures: Deviation of more than 10 percent of full scale of test <br />instrument reading. <br />e.Sound Pressures: Deviation of more than 3 decibels,with consideration for variations in <br />background noise. <br />5.For purposes of re-check,a whole system is defined as one in which inaccuracies will have <br />little or no impact on connected systems;for example,the air distribution system served by <br />one air handler or the hydronic chilled water supply system served by a chiller or the <br />condenser water system. <br />E.In the presence of the Commissioning Authority,verify that: <br />1.Final settings of all valves,splitters,dampers and other adjustment devices have been <br />permanently marked. <br />2.The air system is being controlled to the lowest possible static pressure while still meeting <br />design loads,less diversity;this shall include a review of TAB methods,established control <br />setpoints,and physical verification of at least one leg from fan to diffuser having all balancing <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.