Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Testing,Adjusting,and Balancing for <br />HVAC 23 05 93 - 1 <br />SECTION 23 05 93 <br />TESTING,ADJUSTING,AND BALANCING FOR HVAC <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Testing,adjustment,and balancing of air systems. <br />B.Testing,adjustment,and balancing of ​hydronic​systems. <br />C.Measurement of final operating condition of HVAC systems. <br />D.Ductwork Leakage Testing <br />E.Commissioning activities. <br />1.02 REFERENCE STANDARDS <br />A.AABC (NSTSB)-AABC National Standards for Total System Balance,7th Edition;2016. <br />B.ASHRAE Std 111 -Measurement,Testing,Adjusting,and Balancing of Building HVAC Systems; <br />2008. <br />C.NEBB (TAB)-Procedural Standards for Testing Adjusting and Balancing of Environmental <br />Systems;2015,with Errata (2017). <br />1.03 SUBMITTALS <br />A.TAB Plan: Submit a written plan indicating the testing,adjusting,and balancing standard to be <br />followed and the specific approach for each system and component. <br />1.Submit to Architect. <br />2.Submit to the Commissioning Authority. <br />B.Include at least the following in the plan: <br />1.Indicate standard to be followed (AABC or NEBB) <br />2.List of all airflow,waterflow,and system capacity and efficiency measurements to be <br />performed and a description of specific test procedures,parameters,formulas to be used. <br />3.Copy of field checkout sheets and logs to be used,listing each piece of equipment to be <br />tested,adjusted and balanced with the data cells to be gathered for each. <br />4.Identification and types of measurement instruments to be used and their most recent <br />calibration date. <br />5.Discussion of what notations and markings will be made on the duct and piping drawings <br />during the process. <br />6.Final test report forms to be used. <br />7.Detailed step-by-step procedures for TAB work for each system and issue,including: <br />a.Terminal flow calibration (for each terminal type). <br />b.Diffuser proportioning. <br />c.Branch/submain proportioning. <br />d.Total flow calculations. <br />e.Rechecking. <br />f.Diversity issues. <br />8.Details of how TOTAL flow will be determined;for example: <br />a.Air: Sum of terminal flows via control system calibrated readings or via hood readings of <br />all terminals,supply (SA)and return air (RA)pitot traverse,SA or RA flow stations. <br />b.Water: Pump curves,circuit setter,flow station,ultrasonic,etc. <br />9.Specific procedures that will ensure that systems are operating at the lowest possible <br />pressures and methods to verify this. <br />10.Confirmation of understanding of the outside air ventilation criteria under all conditions. <br />11.Method of verifying and setting minimum outside air flow rate will be verified and set and for <br />what level (total building,zone,etc.). <br />12.Method of checking building static and exhaust fan and/or relief damper capacity. <br />13.Methods for making coil or other system plant capacity measurements,if specified. <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.