Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 Common Motor Requirements for HVAC <br />Equipment 23 05 13 - 1 <br />SECTION 23 05 13 <br />COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.General construction and requirements. <br />B.Applications. <br />C.Single phase electric motors. <br />D.Three phase electric motors. <br />E.Electronically Commutated Motors (ECM). <br />1.02 REFERENCE STANDARDS <br />A.ABMA STD 9 -Load Ratings and Fatigue Life for Ball Bearings;2015. <br />B.IEEE 112 -IEEE Standard Test Procedure for Polyphase Induction Motors and Generators;2017. <br />C.NEMA MG 1 -Motors and Generators;2018. <br />D.NFPA 70 -National Electrical Code;Most Recent Edition Adopted by Authority Having Jurisdiction, <br />Including All Applicable Amendments and Supplements. <br />1.03 SUBMITTALS <br />A.Product Data: Provide wiring diagrams with electrical characteristics and connection <br />requirements. <br />B.Manufacturer's Installation Instructions: Indicate setting,mechanical connections,lubrication,and <br />wiring instructions. <br />C.Maintenance Data: Include assembly drawings,bearing data including replacement sizes,and <br />lubrication instructions. <br />1.04 QUALITY ASSURANCE <br />A.Comply with NFPA 70. <br />B.Provide certificate of compliance from Authority Having Jurisdiction indicating approval of high <br />efficiency motors. <br />C.Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories Inc. <br />as suitable for the purpose specified and indicated. <br />1.05 DELIVERY,STORAGE,AND HANDLING <br />A.Protect motors stored on site from weather and moisture by maintaining factory covers and <br />suitable weather-proof covering.For extended outdoor storage,remove motors from equipment <br />and store separately. <br />PART 2 PRODUCTS <br />2.01 MANUFACTURERS <br />A.Baldor Electric Company/ABB Group <br />B.General Electric <br />C.Leeson Electric Corporation <br />D.Marathon <br />E.Regal-Beloit Corporation (Century) <br />F.Or Approved Equal <br />2.02 GENERAL CONSTRUCTION AND REQUIREMENTS <br />A.Electrical Service: <br />1.Motors 3/4 HP and Smaller: 115 volts,single phase,60 Hz. <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.