Orange County NC Website
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 HVAC GENERAL PROVISIONS 23 01 00 - 7 <br />5.As-built wiring,interlock and control diagrams for equipment with color coding shown on <br />wiring and interlock diagrams. <br />6.Air and Water Balance Report. <br />B.The PDF shall be indexed,bookmarked,dated and signed by the Contractor when completed. <br />C.The operating and maintenance manuals shall be submitted to the Engineer for approval.When <br />the manuals are considered complete by the Engineer,they will be turned over to the Owner for <br />their permanent use. <br />D.For each major piece of equipment,the Contractor shall organize and record on video the on-site <br />training sessions.A copy of the video shall be turned over to the Owner at the completion of the <br />project. <br />END OF SECTION 23 01 00 <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C