Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 HVAC GENERAL PROVISIONS 23 01 00 - 4 <br />F.Where piping,ductwork,or other items are indiacted to be routed in the webbing of joists or <br />trusses,the mechanical contractor shall confirm with the General Contractor/Construction <br />Manager and steel supplier the final joist/truss profile prior to fabricating or order materials.The <br />actual final joist/truss profile shall be used in the BIM coordination effort. <br />G.Openings for insulated piping shall be based on the outside diameter of the insulation with <br />continuous insulation through the opening. <br />H.Seal non-fire rated floor penetrations with non-shrink grout or urethane caulk,as appropriate. <br />I.Seal non-rated wall openeings with urethane caulk. <br />J.Duct/pipe/conduit penetrations through floor slabs of mechanical platforms or slabs above the <br />bottom floor shall have water stopped curb surrounding the pipe/duct/conduit opening.Coordinate <br />with Construction Manager/General Contractor to confirm openings based on Coordination <br />Drawings. <br />K.Pipe,conduit and duct chases required for installation of work shall be provided by the General <br />Contractor unless otherwise noted. This Contractor shall be responsible for coordinating the <br />location of all required chases. <br />L.All work shall be coordinated with other trades. Cutting of new work and subsequent patching <br />shall be at the Contractor's expense at no extra cost to the Owner. <br />M.Contractor shall review the complete construction document package and determine,prior to the <br />bid,which portions of the above grade structural slabs are hard rock concrete and/or light weight <br />insulating concrete.Contractor shall review the Structural Engineer's requirements for attachment <br />of loads to slabs,joists,trusses,and other structural members.DO NOT exceed point loads on <br />Structural Engineer's drawings and details.Unistrut and/or other support appartus required to span <br />multiple joists or beams shall be included in the Contractor's bid.No additional monies will be <br />given for support steel or other components required to support Mechanical piping,duct, <br />equipment,or other items. <br />1.08 GUARANTEE <br />A.See the General and Supplementary General Conditions <br />B.Where extended warranties or guarantees are available from the manufacturer,the Contractor <br />shall prepare the necessary contract documents to validate these warranties as required by the <br />manufacturer and present them to the Architect/Engineer. <br />C.The Contractor shall include in his bid a full warranty and guarantee for a five (5)year period on <br />the compressors for the refrigeration equipment,including all chillers. This warranty does not <br />include labor following the first year's Labor and Material Warranty. <br />PART 2 PRODUCT <br />2.01 GENERAL REQUIREMENTS <br />A.Materials and equipment shall be new,unless noted otherwise,of the highest grade and quality <br />and free from defects or other imperfections. Materials and equipment found defective shall be <br />removed and replaced at the contractor's expense. <br />B.The contractor shall provide name plates for identification of all equipment,switches,panels,etc. <br />C.The name plates shall be laminated phenolic plastic,black front and back with white core,white <br />engraved letters (1/4"minimum)etched into the white core. Name plates shall be fastened with <br />sheet metal screws. <br />PART 3 EXECUTION <br />3.01 INSPECTION <br />A.This Contractor shall examine the areas of completed work and shall insure that no defects or <br />errors are present which would result in the poor application or installation of subsequent work. <br />3.02 TEMPORARY SERVICES <br />A.Refer to Division 01 <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.