Browse
Search
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-127-E-AMS-Comfort Systems USA (Mid Atlantic) LLC-Sportsplex Pool HVAC Unit Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:12:07 PM
Creation date
4/7/2025 1:08:25 PM
Metadata
Fields
Template:
Contract
Date
3/25/2025
Contract Starting Date
3/25/2025
Contract Ending Date
4/1/2025
Contract Document Type
Contract
Amount
$614,000.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Sportsplex Pool HVAC Unit Replacement <br />PDC Project 23022 HVAC GENERAL PROVISIONS 23 01 00 - 2 <br />B.During bidding period: Submitted written requests from Bidders Only,using the forms herein, <br /> will be considered if received ten (10)calendar days prior to the date of receipt of bids to allow <br />for proper evaluation. Requests from suppliers or subcontractors will not be considered. <br /> Substitutions will be considered when a product becomes unavailable through no fault of the <br />Contractor. A request constitutes a representation that the Bidder/Contractor: <br />1.Has investigated proposed product and determined that it meets or exceeds the quality level <br />of the specified product and is suitable for use in the Work. <br />2.Will provide the same warranty for the substitution as for the specified product. <br />3.Will coordinate installation and make changes to other work which may be required for the <br />work to be complete with no additional cost to the Owner. <br />4.Waives claims for additional cost or time extension which may subsequently become <br />apparent. <br />5.Has included a list of similar projects on which this product has been used with names and <br />telephone numbers for verification. <br />6.Has written verification from the product manufacturer that this product has been in use a <br />minimum of two (2)years on a project similar to this work. <br />7.Substitutions will not be considered when they are indicated or implied on shop drawing or <br />product data submittals,without separate written request,or when acceptance will require <br />revision to the Contract Documents. <br />C.Architect/Engineer Review <br />1.Review and approval will rely on manufacturer's literature and other data as outlined herein. <br />2.Inadequacies in such submittals that fail to identify unsuitability are the responsibility of the <br />parties making submittal. <br />D.Substitution Procedure <br />1.Submit three copies of request for substitution for consideration. Limit each request to one <br />proposed substitution. <br />2.Submit shop drawings,product data,and certified test results attesting to the proposed <br />product equivalence. <br />3.Submit listing of similar projects. <br />4.Submit manufacturer's written verification that product has been in use a minimum of two (2) <br />years at similar projects. <br />5.The Architect/Engineer will notify Contractor,in writing,of decision to accept or reject request. <br />6.Products bid or incorporated in the work that are not specified and without written approval of <br />the Architect/Engineer may not be acceptable,and if not,the Contractor will be required to <br />furnish and install the products specified. <br />7.The Architect/Engineer will issue written approvals of product substitutions to all Bidders. <br /> Substitutions are not approved without written approval. <br />8.FORMS: Copy forms incorporated at the end of this section and use for all product <br />substitution requests. <br />1.05 SUBMITTALS <br />A.Refer to General and Supplementary General Conditions and Division 01. <br />B.For satisfying submittal requirements for Division 23,"Product Data"is usually more appropriate <br />than true "Shop Drawings"as defined in Division 01.However,the term "Shop Drawings"may be <br />used throughout the specifications. <br />C.Within ten days after notification of the award of the Contract and written notice to begin work,the <br />Contractor shall submit to the Architect/Engineer for approval a detailed list of equipment and <br />material which he proposes to use. Items requiring submittal data for approval will be noted at this <br />time. <br />D.Mark general catalog sheets and drawings to indicate specific items submitted and their correlation <br />to specific tagged equipment on the drawings.Cross out all nonapplicable or extraneous <br />information that does not apply to the submitted equipment.Circle or otherwise clearly indicate <br />applicable options. <br />Docusign Envelope ID: D4F3B98E-0756-4A0C-A3AD-05AA32D39F1C
The URL can be used to link to this page
Your browser does not support the video tag.