Browse
Search
2025-122-E-AMS-Brady Trane Services-Piedmont Food Processing Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-122-E-AMS-Brady Trane Services-Piedmont Food Processing Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:04:19 PM
Creation date
4/7/2025 1:04:10 PM
Metadata
Fields
Template:
Contract
Date
3/24/2025
Contract Starting Date
3/24/2025
Contract Ending Date
3/24/2025
Contract Document Type
Contract
Amount
$375,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 14 <br />This proposal is subject to cancellation by Brady in the event any contract or purchase order <br />related to this proposal contains a provision that requires Brady to comply with any guidance <br />for contractor or subcontractor workplace locations published by the Safer Federal Workplace <br />Task Force. <br />This proposal is subject to cancellation by Brady in the event Brady is unable to perform due <br />to inability to secure qualified subcontractors willing to comply with any guidance for <br />contractor or subcontractor workplace locations published by the Safer Federal Workplace <br />Task Force, or Brady’s inability to comply with such guidance. <br />Split System Scope Of Work <br />Equipment Demolition, Installation and Specification <br />Brady will recover refrigerant from equipment prior to removal per EPA guidelines, disconnect <br />all power wiring, control wiring, duct work and refrigeration piping as needed for the complete <br />removal and disposal of the existing system. <br />Brady will include all labor, accessories, tools, equipment and materials required to execute the <br />installation of a new Trane Mitsubishi Ductless split system. <br />Equipment Details Below; <br />•Product Data - Trane Mitsubishi Ductless Split System <br />•Qty: 2 Tag(s): ODS/IDS-1, ODS/IDS-2 <br />Single Zone Heat Pump Outdoor Unit <br />Wind Baffle (Field Installed) <br />Wired Remote Controller (Field Installed) <br />Ceiling Cassette Indoor Unit <br />Ceiling Cassette Panel (Field Installed) <br />Condensate Pump (Field Installed) <br />Pipe, Valves, Fittings <br />Brady will furnish and install all pipe, valves, fittings and specialty items as needed for <br />refrigeration piping. <br />All refrigeration piping will be type “L” hard drawn copper tubing and wrought copper fittings. All <br />piping will be cleaned, dehydrated, sealed and marked ACR. <br />Copper to copper joints will be brazed with a copper-phosphorous brazing alloy containing a <br />minimum of 15% silver. <br />After completing piping work, Brady will perform a piping pressure test. Brady will use a <br />Docusign Envelope ID: 33B9741C-8E15-46BC-9277-7C5A263BA05E
The URL can be used to link to this page
Your browser does not support the video tag.