Browse
Search
2025-122-E-AMS-Brady Trane Services-Piedmont Food Processing Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-122-E-AMS-Brady Trane Services-Piedmont Food Processing Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:04:19 PM
Creation date
4/7/2025 1:04:10 PM
Metadata
Fields
Template:
Contract
Date
3/24/2025
Contract Starting Date
3/24/2025
Contract Ending Date
3/24/2025
Contract Document Type
Contract
Amount
$375,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 14 <br />Controls Wiring <br />Brady to furnish and install a programmable thermostat and low voltage wiring. Brady will <br />provide new Equipment with BACnet Cards. Controls integration in not included in this <br />proposal (owner will contract directly with Siemens for Controls work). <br />Start-Up <br />A Brady factory-authorized technician will perform start-up and inspection of new packaged <br />unit according to the manufacturers written instructions. See attachment. <br />Clarifications <br />All work is based on straight time hours: Monday through Thursday from 7:00 am to 5:30 <br />pm. <br />Brady requires that the equipment for this project go through a submittal and review process <br />to verify equipment design and performance before the final order of equipment will be <br />released. This is completed to ensure that the end result meets the owner’s expectations. <br />Brady will request that you assign a company representative to review and sign off on the <br />equipment prior to order placement. <br />When crane work is to be performed over an occupied area a crane lift plan will be provided <br />by the crane company. The plan will be reviewed by Brady’s onsite superintendent and your <br />site appointed personal before any lifting begins. We will require the area surrounding the lift <br />be cleared and barricaded during the work. Once all lifting has been completed all work may <br />resume. <br />The packaged unit selected and quoted for this proposal is based on like for alike change <br />out and does not reflect a change in capacity or load calculation for the area this unit <br />servers. <br />Any code deficiencies related to the existing conditions not specifically identified to be <br />addressed is not included in our scope. <br />Unforeseen conditions related to the owner’s equipment or building that adversely impact <br />the cost of the project may result in additional changes. <br />When changing packaged unit out with like size packaged unit, it is assumed the conduit, <br />wire, disconnects, breakers, electrical panel and duct work are adequately sized to serve <br />the proposed packaged unit, and are functional and installed per code. <br />A structural engineer must approve additional loading of the roof resulting from the <br />installation of new equipment. The owner will be required to provide structural drawings of <br />the roof for evaluation. Cost related to the structural up grades and required modification are <br />not included in our scope and pricing. <br />The building heating and cooling load calculations are based on information provided by the <br />owner. Discrepancies of information provided and actual conditions could result in equipment <br />being sized incorrectly. Brady is not responsible for problems resulting from incorrect information <br />provided by the owner. <br />Docusign Envelope ID: 33B9741C-8E15-46BC-9277-7C5A263BA05E
The URL can be used to link to this page
Your browser does not support the video tag.