Browse
Search
2025-122-E-AMS-Brady Trane Services-Piedmont Food Processing Center HVAC Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-122-E-AMS-Brady Trane Services-Piedmont Food Processing Center HVAC Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 1:04:19 PM
Creation date
4/7/2025 1:04:10 PM
Metadata
Fields
Template:
Contract
Date
3/24/2025
Contract Starting Date
3/24/2025
Contract Ending Date
3/24/2025
Contract Document Type
Contract
Amount
$375,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 01/24 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE PFPC HVAC Replace <br /> FY 2024-2025 RFP RC2022-1001 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 19th day of <br />March, 2025, by and between Brady Trane Services, Inc, (hereinafter called the “Contractor”), and Orange <br />County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange <br />County,” or “Owner”). <br /> <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of a ny inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br /> <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br /> <br />c. Designer approved communications and field orders. <br /> <br />d. Request for Proposals and addenda thereto. <br /> <br />e. Proposal. <br /> <br />2. SCOPE OF WORK <br /> <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Progressive Design Collaborative, LTD (Sheet G1.01, <br />M0.00, M1.01, M2.01, M5.01, M5.02, M7.01, E0.00, E1.01, E2.01, E5.01, E5.02, E6.01 dated <br />May 28, 2024) <br /> <br />b. Written specifications prepared by the Designer. <br /> <br />c. Brady Trane Services, Inc. proposal dated February 13, 2025 which fully describes the work <br />Docusign Envelope ID: 33B9741C-8E15-46BC-9277-7C5A263BA05E
The URL can be used to link to this page
Your browser does not support the video tag.