Orange County NC Website
DEFINITIONS <br /> Item on Form Definition <br /> Attach basis and justification for estimate. Include description , quantities, units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features, similar cast on recent projects, etc. <br /> A. 1 . Demolition Includes but may not be limited to lead or asbestos testing and removal, building or <br /> interior space demolition in whole or part. <br /> A. 2. Site Work Includes but may not be limited to grading , excavating, poor soils or rock removal, <br /> utilities relocation, roads, walks, parking, streambank repairs, stormwater <br /> management, retaining walls, rainwater harvesting systems, landscaping . <br /> Attach explanation of any special building, mechanical, or electrical service <br /> Be 1 . Utility Services requirements with appropriate distance to existing buildings, water, gas, electrical or <br /> other utility service . <br /> Be 9, Associated Construction Costs Includes but may not be limited to construction fire alarm testing, utility shut downs, <br /> utilities, signage, security, displaced parking, staging, lock cores, keys, permits. <br /> B. 10, Other List other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed . <br /> PRECONSTRUCTION Includes but may not be limited to land surveys, lead/asbestos surveys, <br /> COSTS environmental assessments, copying, postage, costs of print advertising, and <br /> destructive testing. For CM at Risk, preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> missi o ons, concealed site conditions, utility conflicts, and extended overhead <br /> resulting from weather or other delay. <br /> 19 <br /> Revised 01/24 <br />