Orange County NC Website
f <br /> Attachment C - Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment &— Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION : <br /> PROJECT CITY or LOCATION : <br /> (Definitions/explanations are provided on pg 2 to assist in completion of this <br /> form.) <br /> CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL <br /> A. Site Preparation <br /> 1 . Demolition $0 <br /> 2. Site Work $0 <br /> B. Construction <br /> 1 . Utility Services $0 <br /> 2. Building Construction (new space) $0 <br /> 3. Building Construction (existing) $0 <br /> 4 . Plumbing (new space) $0 <br /> 5. HVAC (new space) $0 <br /> 6. Electrical (Includes TV & Radio Studio) $0 <br /> 7. Fire Supression and Alarm Systems $0 <br /> 8. Telephone, Data, Video $0 <br /> 9. Associated Construction Costs $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1 . Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. If using lump sum, make entry in $ field. <br /> DESIGN FEE % (% of Estimated Construction Costs) $0 <br /> PRECONSTRUCTION <br /> COSTS % (% of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (% of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (% of Estimated Construction Costs + Contingencies + Design Fee) $0 <br /> Escalation = percent per month multiplied by number of months <br /> (From Est. Date to mid-point of construction) = months % per month <br /> ESCALATION COST INCREASE (Total of Estimated Costs x Escalation %) $0 <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs + Escalation Cost Increase if any) $0 <br /> APPROVED BY: TITLE DATE <br /> 18 <br /> Revised 01/24 <br />