Browse
Search
Agenda - 04-08-2025; 1 - Follow-up Information and Next Steps on Draft Orange County Comprehensive Land Use Plan 2050
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 04-08-2025 Work Session
>
Agenda - 04-08-2025; 1 - Follow-up Information and Next Steps on Draft Orange County Comprehensive Land Use Plan 2050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:25:06 PM
Creation date
4/3/2025 3:17:38 PM
Metadata
Fields
Template:
BOCC
Date
4/8/2025
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Agenda for April 8, 2025 Work Session
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 04-08-2025 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAND USE ALTERNATIVES 15 <br /> EVALUATION REPORT <br /> ORANGE a2050 <br /> Methodology <br /> APPENDIX This section provides a technical step-by-step accounting of the Land Use Alternatives <br /> preparation and testing.ArcGIS Pro was used for the initial preparation of data and for creating <br /> Process for Developing Land Use Alternatives the maps of each land use alternative. Microsoft Excel was used to run the calculations and <br /> The process for developing the land use alternatives was completed in five steps. produce the modeled outputs of new conservation lands,residential capacity,and non- <br /> • First,Community Engagement Window#T solicited feedback from Orange County residential capacity.These steps include: <br /> residents in a survey format about their priorities for land use in the coming decades. <br /> This collective input directly informed the policy direction explored in each alternative. • Step 1:Modify Land.Use Classifications for Alternatives <br /> • Next,Orange County staff worked with Clarion Associates and their subcontractors to <br /> Step 2:Prepare baseline Inventory of Potential Development Areas <br /> synthesize existing land use,planning initiatives,and plans for local municipalities; <br /> identify potential areas of change;and integrate guidance from staff expertise to further • Step 3:Confirm and Model Development Constraints <br /> refine the approach for each alternative. • Step 4:Prepare Model Assumptions <br /> • Following this,Orange County staff and the consultant team met with the Staff Working <br /> Crna an —ricarl of Iaa Ap-hin from mnlfinla rlranna Cni inty rlanarrmantc to raviaw tha <br /> Land Use Alternatives Evaluation Report Page 3r <br /> • Step 5:Compare Open Space Protection,Development Capacity,and Outcomes of <br /> Alternatives <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br />
The URL can be used to link to this page
Your browser does not support the video tag.