Browse
Search
PB Agenda Packet - April 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - April 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 3:41:57 PM
Creation date
4/2/2025 3:38:24 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. There’s a blue line stream going through several structures and event areas. A SWID <br />maybe something to apply for to clear this up. <br /> Fire and Life <br />Safety Date: Staff: <br />Chris Pendergrass <br />cpendergrass@orangecountync.gov <br />919-245-6125 <br />1. None received. <br /> NCDOT Date: 11/18/24 Staff: <br />David Genwright <br />digenwright@ncdot.gov <br />336-570-6833 <br />2. With no proposed work in DOT right of way, and no major changes to the school’s <br />student count no NCDOT action or approval is required. <br /> Planning Date: 11/11/24 Staff: <br />Ashley Moncado <br />919-245-2589 <br />amoncado@orangecountync.gov <br />Application <br />1. Confirm with staff if conditions are being proposed or not. If yes, please provide to staff <br />for review. <br />2. Environmental documents, including Biological Inventory and Environmental <br />Assessment, shall be prepared in accordance with Section 6.16. In addition, please <br />provide State Clearinghouse comments to planning staff when available. <br />3. Construction schedule for project. <br />4. A Neighborhood Information Meeting (NIM) is required for the conditional rezoning <br />application based on Section 2.9.1(D) of the Unified Development Ordinance. <br /> <br />Site Plan <br />1. Include existing land uses for adjacent parcels. <br />2. Provide a vicinity map on Sheet C2.0. <br />3. Add proposed land use “Schools: Preparatory” to project summary. <br />4. Add note stating “Open burning of trees, limbs, stumps, and/or construction debris <br />associated with the permitted activity is expressly prohibited”. <br />5. Add existing contour lines (dashed) and proposed contours (solid) at 5-foot intervals with <br />10-foot contours bold. <br />6. Add setbacks to the nearest parcel line and height for the proposed pole barn. <br />7. Add 30 ft. easement along Grady Brown School Road and Orange Grove Road. <br />8. Based on Orange County GIS, it appears a stream and 65 ft. buffer area is present in <br />the area of the proposed pole barn. Staff recommends the applicant pursue a Surface <br />Water Identification (SWID) Request Form to determine if a stream does or does not <br />exist. <br /> Solid Waste Date: Staff: <br />Matt Taylor <br />mtaylor@orangecountync.gov <br />919-918-4905 <br />1. No Comments. <br /> Stormwater <br />Management Date: 11/15/24 Staff: <br />Christopher Sandt <br />csandt@orangecountync.gov <br />919-245-2583 <br />1. The project is located in the Lower Eno Unprotected Watershed Overlay District. The <br />submittal of a Stormwater Management Plan (SMP) is required if the proposed Land- <br />Disturbing Activity exceeds 12,000 square feet. Land disturbance thresholds are <br />cumulative to parent tract and will carry over to any/all subdivided lots. <br /> <br />66
The URL can be used to link to this page
Your browser does not support the video tag.