Browse
Search
PB Agenda Packet - April 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - April 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 3:41:57 PM
Creation date
4/2/2025 3:38:24 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis <br />Staff Analysis <br />As required under Section 2.8.5 of the UDO, the Planning Director shall cause an analysis to be made <br />of the application. In analyzing this request, the Planning Director offers a full analysis of the <br />application’s consistency with the adopted Orange County 2030 Comprehensive Plan. <br />See the drafted Statement of Consistency (Attachment 6) in which the relevant Goals and Objectives of <br />the Orange County 2030 Comprehensive Land Use Plan have been analyzed in full detail. <br /> 1. The application is complete in accordance with the requirements of the UDO. Staff review <br />determined that the application is complete and all submitted materials are in compliance with the <br />following applicable sections of the UDO: <br /> Section 2.8, Zoning Atlas and Unified Development Ordinance Amendments <br /> Section 2.9, Conditional Districts <br /> Section 5.8.4, School Preparatory <br /> In accordance with Section 2.9.1(F), Approval and Conditions, the applicant has submitted <br />conditions which are to be reviewed by the Board of County Commissioners for a determination as <br />to whether such conditions will afford protection of the public health, safety, and general welfare. <br /> “School: Preparatory” is defined as Use #22 in the Table of Permitted Uses and within Article 10, <br />Definitions of the UDO as: <br /> “A land use providing academic courses designed to satisfy curriculum requirements/standards <br />established by the State of North Carolina Department of Public Instruction including pre-school <br />through 12th grade/pre-college activities provided by either public or private institutions. The <br />term includes kindergarten, elementary/secondary and high schools, schools for the mentally <br />and/or physically disabled, military academies, schools for the deaf or visually impaired, and <br />alternative schools.” <br /> Section 5.2, Table of Permitted Uses of the UDO identifies “School: Preparatory” as a permitted <br />use within the NR-CD zoning district. <br /> 2. Staff review of the application included considerations for how the request relates to the Orange <br />County 2030 Comprehensive Plan. The staff analysis outlines elements of the Plan which staff <br />identified as relevant to the consideration of this request. <br /> 3. The requested zoning district, NR-CD (Non-Residential - Conditional District), is consistent with the <br />2030 Comprehensive Plan, Appendix F, Relationships Between Land Use Classifications and <br />Zoning Districts. <br /> 4. The 2030 Comprehensive Plan identifies 10-Year Transition as land located in areas that are in the <br />process of changing from rural to urban densities and/or intensities, that are suitable for higher <br />densities and/or intensities and could be provided with public utilities and services within the first <br />10-year phase of the Plan update or where such utilities and services are already present or <br />planned. Nonresidential uses implemented in accordance with small area plans and/or overlay <br />districts may be appropriate. <br /> 5. The applicant has provided a basic environmental assessment as part of this submittal. Staff has <br />reviewed and determined no significant environmental impact is expected from this project based <br />on existing conditions. <br /> The proposed development is consistent with existing/anticipated development within the area and the <br />land use associated with the project is compatible with various 2030 Comprehensive Plan goals. <br /> <br />52
The URL can be used to link to this page
Your browser does not support the video tag.