Browse
Search
PB Agenda Packet - April 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - April 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 3:41:57 PM
Creation date
4/2/2025 3:38:24 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
outlined in Section 6.13 of the Orange County UDO. Based on the submitted materials <br />for the proposed development, the project could meet the basic Erosion and <br />Sedimentation Control requirements as outlined in Section 6.15 of the Orange County <br />UDO and could be developed as generally proposed. The proposal has a planned stream <br />crossing that will require an Army Corps PCN 404/401 application for the stream impact. <br />A copy of the Army Corps. determination needs to be sent to Orange County. A Buffer <br />Authorization Certificate (BAC) application submittal to Orange County is also required <br />for the stream buffer impact. <br /> <br />Stormwater Management: <br />The submitted materials indicate a level of development that could meet current UDO <br />requirements specific to stormwater management. The applicant has submitted a <br />Preliminary Stormwater Narrative & Report indicating that two (2) permanent Stormwater <br />Control Measure (SCM) structures will be constructed as part of the project to meet water <br />quantity requirements (i.e., post-development stormwater runoff attenuation). There are <br />no water quality requirements (i.e., post-development nutrient attenuation) currently <br />associated with the Watershed Overlay District within which the project is located. The <br />project will need to meet applicable stormwater management requirements as outlined in <br />Section 6.14 of the Orange County UDO and must be in general conformance with the <br />North Carolina Stormwater Design Manual (i.e., Minimum Design Criteria). <br /> <br />Conclusion: <br />The Division has No Objections to the approval of the Major Subdivision application so <br />long as a complete LDP application and supporting plans and calculations are submitted <br />to Orange County for review, processing, and approval prior to commencement of on-site <br />Land-Disturbing Activity. As the project progresses, additional field observations, and/or <br />permitting by others (e.g., US Army Corps of Engineers, NC Department of Environmental <br />Quality, NC Department of Transportation, etc.), additional buffers, setbacks, and/or <br />additional Orange County review and permitting may apply beyond the proposed <br />development as shown with this rezoning request. <br /> <br /> <br />___________________________ _______________ <br /> Christopher Sandt, PE Date <br /> <br /> February 5, 2025 <br />___________________________ _______________ <br /> Steve Kaltenbach Date <br /> <br />253
The URL can be used to link to this page
Your browser does not support the video tag.