Browse
Search
PB Agenda Packet - April 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - April 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 3:41:57 PM
Creation date
4/2/2025 3:38:24 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
added to Cover Sheet that reads “Turnaround design and associated ROW <br />geometry will be determined on final plat, pending County and NCDOT approval.” <br /> <br />4. Stormwater: − The Subdivision Roads Minimum Construction Standard's page 17 has <br />NCDOTS expectations on stormwater controls. <br />Applicant Response: Noted, thank you. − Narrative and Report - The stormwater report is being reviewed by <br />NCDOT's Hydraulics Unit for a more specialized response. Comments are <br />forthcoming. <br />Applicant Response: Thank you, we look forward to receiving them. <br /> <br />5. Addition to State Maintenance System: − The developer and or the residence of the subdivision will need to petition <br />the roads to be added into the state maintenance system. All requirements <br />will need to be met at the time of petition for consideration. <br />Applicant Response: Noted, thank you. <br /> <br /> Planning Date: 2/17/24 Staff: <br />Ashley Moncado <br />amoncado@orangecountync.gov <br />919-245-2589 <br />1. The remaining $46 of the review fee is outstanding and will need to be paid prior <br />to Planning Board review. <br />Applicant Response: The fee has been paid. <br />2. Please provide update regarding the status of the recombination plat. <br />Applicant Response: Plat has been prepared and is in the process of being <br />recorded. <br />3. Provide the two correct PINs in the Preliminary Plan title block related to this <br />subdivision. <br />Applicant Response: Missing PIN added to main parcel. <br />4. Phasing lines shall be added to the Preliminary Plan sheet. Please include a <br />table summarizing the phasing schedule. <br />Applicant Response: Phase lines and schedule added to Preliminary Plat. <br />5. Building setback lines shall be illustrated or labeled on at least one lot on the <br />Preliminary Plan sheet. <br />Applicant Response: Setbacks have been labeled on lot #34. <br />6. Show the lot dimensions for each lot shown on the Preliminary Plan sheet. <br />Applicant Response: Lots have been dimensioned. <br />7. Note average lot size for the entire subdivision. <br />Applicant Response: Average lot size has been noted. <br />8. The location, dimensions and classification of all proposed streets, easements, <br />alleys and other right of ways shall be shown on the plat. <br />Applicant Response: Typical street sections shown on Preliminary Plat. <br />9. The location and dimensions of proposed pedestrian paths and sidewalks, bike <br />lanes or paths, shall also be shown. This would include the nature trail contained <br />in the approved concept plan. <br />Applicant Response: Trails shown and labeled on Preliminary Plan. <br />248
The URL can be used to link to this page
Your browser does not support the video tag.