Browse
Search
PB Agenda Packet - April 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - April 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 3:41:57 PM
Creation date
4/2/2025 3:38:24 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Questions asked at the Eden View Acres Neighborhood Information Meeting 3/22/23 <br />• Road type and maintenance? (paved & maintained by NCDOT) <br />• Multiple home builders? (yes but it will be a selective process) <br />• Lot size? (average of 2-5 acres) <br />• Reason for Rezoning? (the Orange County UDO requires it in order for this to be a flexible <br />subdivision which helps to save open space) <br />• Can more houses be added after this Rezoning? (no, would have to Rezone the property again) <br />• Will it affect existing agriculture on adjacent property? (no) <br />• What if someone gets hurt on adjacent property. (their liability insurance should cover that) <br />• Will there be covenants on the Open Space? (yes) <br />• Could someone build something like a soccer field in the Open Space? (no, that would be <br />considered a major change and would trigger another Rezoning) <br />• Will the homeowners live in the houses? (yes, they are not speculative homes as they will be <br />custom built and designed for each homeowner.) <br />• Will there be “spec houses”? (no, not typically, but we do allow the opportunity for a builder to <br />build a show home that will then be put on the market.) <br />• What size will the houses be? (minimum of 1,500 sf) <br />• Will this be a gated community? (no) <br />• Can neighbors use the trails? (yes, either by individual invitation or through a blanket invitation <br />where neighbors that were notified about the NIM would be allowed to use the trails) <br />• View into the site? (houses will be situated among trees where possible and trees will be <br />planted where necessary to screen houses that might be visible from the road) <br />• Existing road off of Orange Grove to be emergency access only? (yes) <br />o Open during construction? (no) Gated? (yes) <br />• Are home footprints set in stone? (no) <br />o Can homes be moved elsewhere on the lot? (yes, with the direction of the ARB) <br />• Can homeowners cut down trees on their lots? (they will need permission for trees over 8” from <br />the ARB) <br />• Who controls changes within the Open Spaces? (HOA - homeowner’s association) <br />• Will private property be controlled by the HOA? (the ARB restricts the property as a whole to <br />the design specification it has published and will protect within the protected viewsheds) <br />• Will there be a farm? (yes but edible plantings will be limited to trails at first) <br />• Who maintains the farm? (There will be an operator that will be selected by the HOA) <br />• Will there be septic spray systems? (no, they will be underground) <br />• What is the expected timeline and cost? (5+ years to buildout, unknown cost at this time) <br />• Why is it phased? (this allows more flexibility and cost balancing during the sales and building <br />process) <br />o Can the start of Phase 2 be restricted so Phase 1 must be completed first? (not by the <br />County, the developer can do this if desired) <br />• Proximity to each other? (they won’t be very close to each other) <br />Concerns raised: <br />• Orange Grove community (hope it won’t be closed off) <br />236
The URL can be used to link to this page
Your browser does not support the video tag.