Browse
Search
PB Agenda Packet - April 9 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2025
>
PB Agenda Packet - April 9 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 3:41:57 PM
Creation date
4/2/2025 3:38:24 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2025
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff have jointly reviewed the materials and agree with a determination of “Finding of No Significant <br />Impact (FONSI)” as required in Section 2.25.1(B)(5) of the UDO (Attachment 5). This determination <br />eliminates a requirement from the applicant to provide a more detailed Environmental Impact Statement, <br />as outlined in Sections 2.25.2 and 6.16.4 of the UDO. <br /> <br /> <br />Proposed Conditions <br />Per NCGS 160D-703, imposed conditions and site-specific standards are limited to those that address <br />conformance of the development and use of the site to local government ordinances and adopted plans <br />or the impacts reasonably expected to be generated by the development or use of the site. Per Section <br />2.9.1(F)(3) of the UDO, the following conditions are proposed: <br />1. The property shall be developed consistent with the reviewed site plan and application as acted <br />upon by the Orange County Board of Commissioners on June 3, 2025. <br />2. The existing Go Kart use and tract contained on the existing 80.52-acre tract shall be terminated <br />and shall no longer operate on site. <br />3. Retail sales from the proposed rental office shall be limited to packing supplies (i.e. boxes, tape, <br />packing materials, etc.) and shall not involve the sale of general retail items such as food, drinks, <br />or other similar items not consistent with the use of the property as a self-storage facility. <br />4. No ancillary commercial or residential use of individual storage facilities shall be permitted. This <br />includes the use of storage facilities for automotive repair or retail sales. <br />5. No hazardous materials shall be stored on the property. <br />6. The applicant shall contract with a private solid waste contractor to remove trash from the site <br />consistent with the submitted site plan and in accordance with the Orange County Solid Waste <br />Management Ordinance. <br />7. The facility shall meet all applicable requirements of the State of North Carolina Building Code. <br />8. The storage facility’s hours of operation shall not be before 6:00 am nor after 9:00 pm. <br />9. Outdoor lighting fixtures shall not exceed 25-feet in height from ground level. All lighting shall be <br />downward to minimize light trespass and obtrusive lighting. <br />10. The property owner shall record a final plat dividing the +/- 11.22-acre parcel from the existing +/- <br />80.52-acre tract within 120 days of BOCC approval of the rezoning application. <br />11. Offsite easements for water, wastewater, utilities, and access shall be recorded within 120 days <br />after approval of the rezoning application. <br />12. Offsite landscape preservation easement shall be recorded within 120 days after approval of the <br />rezoning application. <br />13. Impervious surface transfer shall be recorded within 120 days after approval of the rezoning <br />application. <br />14. The project shall maintain the existing vegetation on the north, south, and west sides of the site <br />and incorporate an offsite easement area of approximately 1.28 acres along the northern, <br />southern, and western parcel lines in lieu of standards contained in Section 6.8, Landscaping, <br />Buffers, and Tree Protection: Street Trees, Between Lot Plantings, Foundation Plantings, <br />Landscaping of Vehicular Areas, and Screening of the Unified Development Ordinance. <br />15. The final landscape plan will be reviewed as part of the Zoning Compliance Permit process. If <br />existing vegetation contained onsite or within the recorded landscape preservation easement <br />area does not meet UDO standards, additional plantings shall be required. <br />16. All required landscaping shall be installed prior to the issuance of a Certificate of Occupancy <br />allowing for the units to be rented/occupied. <br />Solid Waste <br />The applicant has indicated development within the project will conform to the Orange County Solid <br />Waste Management Ordinance (Attachment 5). <br />145
The URL can be used to link to this page
Your browser does not support the video tag.