Browse
Search
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 04-01-2025 Business Meeting
>
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:25:52 PM
Creation date
3/27/2025 3:28:16 PM
Metadata
Fields
Template:
BOCC
Date
4/1/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for April 1, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 04-01-2025 Business Meeting
OTHER-2025-021- Efland EMS Station Stormwater Operations and Maintenance Plan Agreement with Orange County 3800 US 70 West,Efland
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-022- Approval of Professional Services Agreement for Historic Courthouse Square building and grounds improvements
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-023-Letters of Support for OWASA
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-007-Volunteer Week Proclamation (2)
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-008-County Government Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-009-Native Plant Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-011-Black Maternal Health Week Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
PRO-2025-012-Fair Housing Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-015-Orange County Transportation Priority List for SPOT 8 FY 2027-2036 STIP
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-016-Motor Vehicle Property Tax Releases Refunds
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-017-Property TaxReleases Refunds
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-018-Resolution to Rescind a County Review Officer Appointment
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> 4.2.1 At the times designated herein, the Designer shall develop an estimate of the total cost of the Project (the "Total Project Cost"), including <br /> Designer's fees, costs of the construction, costs of equipment,furnishings, furniture and signage, permit fees and appropriate contingencies, and <br /> exclusions,where applicable.These costs shall be prepared and submitted to the Owner substantially in the format shown in Attachment C to this <br /> Agreement,with supporting documents listing quantities, unit price, labor rates, man-hour estimates, overhead and profit. Total Project Cost shall be <br /> mutually agreed upon by Owner and Designer as noted in paragraph 4.2.4. The timing of this Total Project Cost agreement shall be identified as a <br /> milestone in Attachment D. If cost estimating is not part of the project scope, the Total Project Cost shall be specified here: [BLANK] <br /> 4.2.2 Project cost estimates shall be prepared by qualified staff members of the Designer or the authorized Project Consultants listed on Attachment <br /> E, or a qualified cost estimating Consultant to the Designer who are acceptable to the Owner. <br /> 4.2.3 Total Project Cost estimates shall be prepared at NA points in the production of the Designer's work: <br /> A. At completion of NA design; and <br /> B.At completion of NA; and <br /> C. At completion of NA of the construction documents; and <br /> D. Cost Estimate will be provided at the end of Task 1,within eight(8) months from the start of contract. <br /> 4.2.4 If applicable per section 4.2.3, when the first of these estimates of Total Project Cost has been approved in writing by the Owner, it shall be used <br /> by the Owner as a basis for appropriating funds specifically for the Project. Once this Total Project Cost has been so approved by the Owner and the <br /> conditions of the project (cost environment,time schedule, etc.) are reasonably similar,the Designer shall be obligated, without additional <br /> compensation, to adjust the design of the Project to assure that it remains within the approved Total Project Cost. <br /> 4.2.5 Should bidding or negotiation with contractors produce prices which,when added to the other elements of the approved Total Project Cost, <br /> produce a cost that is in excess of the approved Total Project Cost, the Designer shall participate with the Owner in negotiation and design adjustments <br /> to the extent such are necessary to obtain prices within the approved Total Project Cost. All activity of the Designer with respect to these matters shall <br /> constitute Basic Services and shall be performed by the Designer without additional compensation. If negotiation and design adjustments fail to bring <br /> costs within the Total Project Cost the Owner may reject all bids and Designer will redesign or reduce portions of the project in an effort to reduce the <br /> bid prices to within the Total Project Cost and rebid the project. All such redesign is included within Basic Services. If this second letting for bids does <br /> not produce bids that are within the approved Total Project Cost initially or after negotiations with the contractor,the Designer is not obligated to <br /> further redesign the Project. <br /> 4.3 Project Conferences <br /> 4.3.1 For the duration of the development of the Project,the Designer and its Consultants shall meet periodically with the Owner.The Designer shall <br /> meet with Owner as necessary to properly fulfill the requirements of this Agreement. The minimum regularly scheduled meetings which the Designer <br /> shall be required to attend are listed below: <br /> 1. Conduct Project Kickoff meeting <br /> 2. Conduct County Design Committee meeting to review preliminary findings and recommendations of potential options. <br /> 3. Conduct informal presentation of findings and recommendations to County design committee to deliver draft Assessment Report of findings, <br /> recommendations, and cost estimates for recommended actions. <br /> 4. Provide presentation of findings for final Assessment Report. <br /> 4.4 Construction Administration <br /> 4 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.