Browse
Search
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 04-01-2025 Business Meeting
>
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:25:52 PM
Creation date
3/27/2025 3:15:27 PM
Metadata
Fields
Template:
BOCC
Date
4/1/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for April 1, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 04-01-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> Angel Barnes Page 3 <br /> 25 February 2025 <br /> Task 2b—Courthouse Square: landscape architecture,planning, and site engineering services: <br /> • Review and assess the current site features, trees,plantings, and hardscape of the <br /> square as the first step to developing plans for improvements and enhancements. <br /> • Develop a new long-range Master Plan for the square, to address all major areas of <br /> concern,including but not limited to sidewalks, accessibility,lighting, seating, <br /> plantings,interpretive signage, and drainage for the site and the building. This plan <br /> will be developed through a public process that solicits and incorporates input from <br /> major stakeholders (including Courts, Orange County,Town of Hillsborough,Arts <br /> Council,Visitors Bureau,Historic District Commission, and advocates for <br /> accessibility). <br /> • It is understood that a minimum of three (3) public input meetings with community <br /> stakeholders will be required as part of the preparation of the Master Plan for <br /> Courthouse Square. <br /> • The recommendations and work proposed in the approved Master Plan will be <br /> implemented as part of the overall building and grounds improvement project as <br /> funding becomes available. <br /> JKOA will work with an Owner design committee which shall include but not be limited to <br /> the Orange County Landscape Architect, the Orange County Cultural Resources <br /> Coordinator, the Capital Projects Manager, the Capital Field Coordinator, and a <br /> representative from the Courts Division. The County Manager shall have final approval on <br /> all decisions related to this project. <br /> Proposed Consultant Team <br /> Based on our understanding of your needs,we propose the following team of professional <br /> consultants for the project: <br /> Joseph K. Oppermann—Architect,P.A. QKOA) Project Management, <br /> Architecture, Historic <br /> Preservation <br /> Aaslestad Preservation Consulting LLC (APC) Photographic Survey, <br /> Photogrammetric Model, <br /> AutoCAD Base Drawings <br /> Medlock&Associates Engineering, P.A. (Medlock) Structural Engineering <br /> Loring Consulting Engineers,Inc. (Loring) Mechanical,Electrical, <br /> Plumbing, and Fire Protection <br /> Engineering/ Lighting Design <br /> STACH pllc (Stach) Landscape Architecture <br /> Slater Conservation (Slater) Architectural Conservation <br /> and Materials Analysis <br /> Engineering Consulting Services (ECS) Hazardous Materials <br /> Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.