Orange County NC Website
21 <br /> DEFINITIONS <br /> Item on Form Definition <br /> Attach basis and justification for estimate. Include description,quantities,units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. <br /> A. 1.Demolition Includes but may not be limited to lead or asbestos testing and removal, building or <br /> interior space demolition in whole or part. <br /> A.2.Site Work Includes but may not be limited to grading,excavating, poor soils or rock removal, <br /> utilities relocation,roads,walks,parking,streambank repairs,stormwater <br /> management,retaining walls,rainwater harvesting systems,landscaping. <br /> Attach explanation of any special building, mechanical,or electrical service <br /> B. 1. Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or <br /> other utility service. <br /> B.9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing, utility shut downs, <br /> utilities,signage,security,displaced parking,staging,lock cores, keys,permits. <br /> B. 10. Other List other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed. <br /> PRECONSTRUCTION Includes but may not be limited to land surveys,lead/asbestos surveys, <br /> COSTS environmental assessments,copying, postage,costs of print advertising,and <br /> destructive testing. For CM at Risk, preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> omissions,concealed site conditions, utility conflicts,and extended overhead <br /> resulting from weather or other delay. <br /> 19 <br /> Revised 01/24 <br />