Browse
Search
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 04-01-2025 Business Meeting
>
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:25:52 PM
Creation date
3/27/2025 3:15:27 PM
Metadata
Fields
Template:
BOCC
Date
4/1/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for April 1, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 04-01-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> DEFINITIONS <br /> Item on Form Definition <br /> Attach basis and justification for estimate. Include description,quantities,units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. <br /> A. 1.Demolition Includes but may not be limited to lead or asbestos testing and removal, building or <br /> interior space demolition in whole or part. <br /> A.2.Site Work Includes but may not be limited to grading,excavating, poor soils or rock removal, <br /> utilities relocation,roads,walks,parking,streambank repairs,stormwater <br /> management,retaining walls,rainwater harvesting systems,landscaping. <br /> Attach explanation of any special building, mechanical,or electrical service <br /> B. 1. Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or <br /> other utility service. <br /> B.9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing, utility shut downs, <br /> utilities,signage,security,displaced parking,staging,lock cores, keys,permits. <br /> B. 10. Other List other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed. <br /> PRECONSTRUCTION Includes but may not be limited to land surveys,lead/asbestos surveys, <br /> COSTS environmental assessments,copying, postage,costs of print advertising,and <br /> destructive testing. For CM at Risk, preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> omissions,concealed site conditions, utility conflicts,and extended overhead <br /> resulting from weather or other delay. <br /> 19 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.