Browse
Search
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 04-01-2025 Business Meeting
>
Agenda - 04-01-2025; 8-e - Approval of Professional Services Agreement for Historic Courthouse Square Building and Grounds Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:25:52 PM
Creation date
3/27/2025 3:15:27 PM
Metadata
Fields
Template:
BOCC
Date
4/1/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for April 1, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 04-01-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> 12.5.1 This Agreement represents the entire and integrated agreement between the Owner and the Designer and supersedes all prior negotiations, <br /> representations or agreements, either written or oral.This Agreement may be amended only by written instrument signed by both the Owner and the <br /> Designer. <br /> 12.6 Severability <br /> 12.6.1 If any provision of this Agreement is held as a matter of law to be unenforceable,the remainder of this Agreement shall be enforceable without <br /> such provision. <br /> 12.7 Ownership of Documents <br /> 12.7.1 All designs, drawings, specifications, design calculations, notes and other works developed in the performance of this contract shall become the <br /> property of the Owner and may be used on any other project without additional compensation to the Designer. Designer does not warrant the use of <br /> the documents by the Owner or by any person or entity for any purpose other than the Project as set forth in this agreement. <br /> 12.8 E-Verify <br /> 12.8.1 Pursuant to the terms of North Carolina General Statutes no county may enter into a contract unless the Designer and its subconsultants comply <br /> with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable,failure to maintain compliance with the <br /> requirements of Article 2 of Chapter 64 of the General Statutes constitutes Designer's breach of this Agreement. By executing this Agreement Designer <br /> affirms Designer is in compliance with Article 2 of Chapter 64 of the North Carolina General Statutes. <br /> 12.9 Electronic Signatures <br /> 12.9.1 This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures affixed hereto <br /> evidence the intent of the Parties to comply with Article 11A and Article 40 of North Carolina General Statute Chapter 66. <br /> 12.10 Iran Divestment and Israel Boycott <br /> 12.10.1 Designer certifies that, as of the date listed below, it is not on the Final Divestment List as created by the State Treasurer pursuant to N.C.G.S. § <br /> 147-86.58 or the final boycott list created by the State Treasurer pursuant to N.C.G.S. §147-86.81 nor shall Designer utilize in the performance of this <br /> Agreement any subcontultant or consultant identified on such lists. <br /> 12.11 List of Attachment and Referenced Documents and Priority <br /> 12.11.1 The design documents consist of this Agreement and the attached and referenced documents. The attachments and referenced documents are <br /> listed in this Section 12.11.1 and are incorporated herein and made part of this Agreement by reference. In the event of any inconsistency between or <br /> among the terms of this Agreement and any of the incorporated listed documents such inconsistency or conflict shall be interpreted in the following <br /> order of priority: <br /> This Agreement <br /> Attachment A- Description of the Project <br /> Attachment B- Description of Basic Services <br /> Attachment C- Format of Total Project Cost Estimate(s) <br /> Attachment D- Key Milestone Listing <br /> Attachment E-Consultants and Key Personnel <br /> 13 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.