Browse
Search
Agenda - 04-01-2025; 6-a - Orange County Transportation Priority List for SPOT 8.0 - FY 2027-2036 STIP
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 04-01-2025 Business Meeting
>
Agenda - 04-01-2025; 6-a - Orange County Transportation Priority List for SPOT 8.0 - FY 2027-2036 STIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:26:22 PM
Creation date
3/27/2025 3:15:05 PM
Metadata
Fields
Template:
BOCC
Date
4/1/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for April 1, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 04-01-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> Attachment 3: Draft Burlington-Graham Metropolitan Planning Organization (BGMPO) Project List <br /> MPO/ Recommendation <br /> # RPO Project Description/Need <br /> Staff TAS OUTBoard <br /> Description: Widen US-70 and improve intersections from Buckhorn Road (SR- <br /> 1114)to Durham County with NCDOT standard street cross-section 4G (110' row, <br /> 17.5' median, 11'travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and Change, <br /> safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Modernization <br /> 1 BGMPO/ US-70 Road (SR-1004), Frazier Road (SR-1310), Richmond Road (SR-1312), Approve Approve with <br /> TWTPO Improvements* Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR- Intersection <br /> 1555), Lawrence Road (SR-1561), Palmers Grove Church Road (SR-1562), Improvement <br /> Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N and CS <br /> Scotswood Boulevard (SR-2300). <br /> Mattress Description: Construct a new interchange at the existing grade-separated crossing <br /> 2 BGMPO Factory Road of Mattress Factory Road and 1-85/1-40 Approve Approve Approve <br /> Interchange <br /> Mattress Description: Extend Mattress Factory Road northward across East Washington <br /> Factory Road Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 <br /> 3 BGMPO Extension to and close the existing railroad crossover road connecting East Washington Street Approve Approve Approve <br /> U.S. 70 and U.S. 70 approximately 240 feet to the east of the intersection of Mattress <br /> Factory Road and East Washington Street. <br /> Buckhorn Description: Widen Buckhorn Road from 1-40/1-85 to West Ten Road (SR1144)to <br /> 4 BGMPO Road (SR multiple lanes with bicycle and pedestrian facilities with grade separation over Approve Approve Approve railroad to US-70.Wideni <br /> Lebanon Road <br /> 5 BGMPO/ (SR-1306) Description: Intersection and safety improvements along Lebanon Road (SR- Approve Approve Approve <br /> TWTPO improvements* 1306)from Mill Creek Road (SR-1345)to Efland-Cedar Grove Road (SR-1004) <br /> Notes: <br /> ** Sidewalk subject to NCDOT sidewalk cost share policy 40%Orange County for VY 5' of sidewalk, 100%Orange County for any additional sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.