Browse
Search
2025-120-E-AMS-Siemens Industry-Efland EMS - AAON Unit BAS rework
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-120-E-AMS-Siemens Industry-Efland EMS - AAON Unit BAS rework
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 1:32:01 PM
Creation date
3/20/2025 1:31:58 PM
Metadata
Fields
Template:
Contract
Date
3/19/2025
Contract Starting Date
3/19/2025
Contract Ending Date
3/19/2025
Contract Document Type
Contract
Amount
$4,250.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 <br />ORANGE COUNTY <br />CHANGE ORDER REQUEST <br />NORTH CAROLINA <br />______________________________________________________________________________________________________________ <br />Date: March 18, 2025 Project: Efland EMS Station Change Order No. 01 Department: AMS Department Address: 306 <br />Revere Road, Hillsborough Project: Efland EMS Station Building Controls Contractor: Siemens Industry, Inc. Contractor Address: 215 <br />Southport Drive, Ste 900 Morrisville, NC 27560 Effective date of original contract: 05/05/2022 <br />This change order increases decreases the contract time by 1056 days. Check here if no impact to contract time . <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial completion is: March <br />26, 2025 <br />_______________________________________________________________________________________________________________ <br />Full Description of Change: Provide labor and materials to re-engineer and re-program BAS associated with the AAON unit. <br />Reason for Change: The AAON unit that was shipped to the site was equipped for stand alone control, with multiple safeties built into the unit to the <br />control fan enable and compressors. The unit was specified to be shipped without controls so that Siemens would install their controls and tie into the <br />Desigo system. This rework was required in order to tie this unit into the controls. The change order will be paid from the general contractors retainage <br />due to not receiving the unit as approved per the submittal. <br />_______________________________________________________________________________________________________________ <br />Original contract sum: $ 165,540.00 <br />Contract sum prior to this change order: $ 165,540.00 <br />Amount of this change order: $ 21,116.19 <br />Total sum of the contract including this change order: $ 186,656.19 <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, project, services, or <br />work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 19th day of March, 2025. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br />By:____________________________ By:___________________________ By:___________________________ <br />Docusign Envelope ID: 334E53D7-9438-4787-AC81-6F134A2B369E <br />3/18/2025 <br />Area Geneeral Manager County Manager <br />3/19/2025
The URL can be used to link to this page
Your browser does not support the video tag.