Browse
Search
2025-114-E-AMS-Precision Walls-SHSC BOCC Meeting Room Curtains
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-114-E-AMS-Precision Walls-SHSC BOCC Meeting Room Curtains
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 1:18:07 PM
Creation date
3/20/2025 1:17:44 PM
Metadata
Fields
Template:
Contract
Date
3/12/2025
Contract Starting Date
3/12/2025
Contract Ending Date
3/18/2025
Contract Document Type
Contract
Amount
$7,035.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B.For all sums which the insured becomes legally <br />obligated to pay as damages caused by <br />"occurrences" under Section I – Coverage A, and <br />for all medical expenses caused by accidents under <br />Section I – Coverage C, which cannot be attributed <br />only to ongoing operations at a single designated <br />construction project shown in the Schedule above: <br />1.Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products-completed Operations Aggregate Limit, <br />whichever is applicable; and <br />2.Such payments shall not reduce any Designated <br />Construction Project General Aggregate Limit. <br />C.When coverage for liability arising out of the <br />"products-completed operations hazard" is <br />provided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products-completed operations hazard" will <br />reduce the Products-completed Operations <br />Aggregate Limit, and not reduce the General <br />Aggregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D.If the applicable designated construction project <br />has been abandoned, delayed, or abandoned and <br />then restarted, or if the authorized contracting <br />parties deviate from plans, blueprints, designs, <br />specifications or timetables, the project will still be <br />deemed to be the same construction project. <br />E.The provisions of Section III – Limits Of Insurance <br />not otherwise modified by this endorsement shall <br />continue to apply as stipulated. <br />CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 2 of 2 <br />Docusign Envelope ID: B61CE74E-980D-45EA-B9F9-C4F195E3CFD2
The URL can be used to link to this page
Your browser does not support the video tag.