Orange County NC Website
<br /> ORANGE COUNTY GOVERNMENT | NOVEMBER 22, 2024 <br />RFP #367-OC 5439 | COMPREHENSIVE USER FEE STUDIES PAGE 35 <br /> <br />Cost Proposal <br />Defined by Impact. Driven by People. <br />Dedicated to the Community. <br />In this section, we have laid out how long each milestone will take for each scope of this project, <br />detailing the timeline and cost per task. This budget will provide the County with ample time and <br />resources to produce a fees and charges study as described in the scope of service. This scope <br />of work is our understanding based on the RFP. We are willing to discuss changes to the scope. <br />Scope Finalization and Fee Inclusion <br />MGT understands that the scope of this user fee study may evolve based on Orange County’s <br />determination of which fees are eligible for review. While the County has indicated that some <br />fees, such as Personal Health and Solid Waste Program fees, are likely to be excluded, the <br />comprehensive fee list referenced on the County’s website includes departments and fee <br />groups such as Aging, Elections, Emergency Management, Fire Marshal, Sheriff, Animal <br />Services, Environmental Health, and the Sportsplex. These are the specific departments that are <br />assumed will be included in the RFP as the “first” comprehensive user fee study (Section 4.2.1 <br />on page 6 of the RFP). <br />To ensure the study is tailored to meet the County’s needs and maximizes value, MGT proposes <br />an initial scope refinement meeting following contract award. During this meeting, we will work <br />with County leadership to: <br />• Finalize the list of departments and fee groups to be included in the study. <br />• Discuss and confirm which fees should be excluded from review, based on statutory <br />requirements, existing analysis, or operational considerations. <br />• Refine tasks and deliverables based on the agreed scope. <br />This collaborative approach ensures clarity and alignment from the outset, allowing us to focus <br />our resources on areas that will deliver the greatest impact for Orange County. Additionally, <br />MGT will remain flexible throughout the engagement to address any changes or refinements <br />that arise as the County gains further clarity on its priorities. <br />Total cost for the proposed services for the user fee study for Orange County <br />at countywide level Description Completion Date Fee ($) Task Subtask 1.0 Project Management Tasks <br /> 1.1 Arrange interview schedules and request data 1/2025 2,296 <br />1.2 Kickoff meeting (online) 1/2025 - <br />Confirmation of scope and project purpose 1/2025 - <br />Acceptance criteria for deliverables 1/2025 - <br />Status reporting and correspondence protocols 1/2025 - <br />Issue escalation protocol 1/2025 - <br />Docusign Envelope ID: B9D098A3-ADE5-4D27-B060-F08A595B7E7D