Browse
Search
2025-107-E-AMS-CPL Architecture-Additional Services for the site development
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-107-E-AMS-CPL Architecture-Additional Services for the site development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 1:10:07 PM
Creation date
3/20/2025 1:10:01 PM
Metadata
Fields
Template:
Contract
Date
3/6/2025
Contract Starting Date
3/6/2025
Contract Ending Date
3/11/2025
Contract Document Type
Contract
Amount
$74,700.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER #1 <br />PROJECT: Orange Crisis Diversion Center <br /> <br />CLIENT: CPL Architecture <br /> 6302 Fairview Road, Suite 102 <br /> Charlotte, NC 28210 <br /> <br />DATE: February 17, 2025 TIMMONS GROUP PROJECT NO: 70198 <br /> <br /> <br /> <br /> <br />Thank you for offering us to provide this proposal for the following additional Services: <br />Additional Services. <br /> <br />Onsite additions per developer - $37,500 <br />• Design and Permitting <br />• Increased clearing and pad grading <br />• Increased erosion control design and permitting <br />• Additional roadway design <br />• Additional landscaping/streetscape <br />• Additional stormwater design <br />• Additional utility design <br />• Additional construction administration and certifications <br /> <br />Seasonal High Water Table Testing/Clearing - $3,500 <br />• Two seasonal high water table tests as SCM locations <br />• Clearing required to access areas for testing <br /> <br />Pumps Station Drawdown - $2,500 <br />• Site visit and station drawdown for downstream pump station <br />• Calculate flow rates to determine if existing station is adequate <br /> <br />WB Left turn lane on Waterstone Drive - $13,000 <br />• Left turn lane and tapers <br />• Median break <br />• Striping and signage <br /> <br />EB Right turn lane on Waterstone Drive - $17,000 <br />• Right turn lane and tapers <br />• Extend existing culverts <br />• Remove/relocation and coordination for existing storm system <br /> <br />Traffic Memo - $1,200 <br />• Traffic memo for improvements <br /> <br /> <br />Notes: (1) This work is in addition to the scope of work listed in Timmons contract signed August 23, 2024. <br /> <br />Acknowledged and Accepted: <br /> <br /> 02/17/25 <br />Client Date Project Manager Date <br />Docusign Envelope ID: 13ED7AB3-8E40-45CC-B7A6-9154B7779BF8
The URL can be used to link to this page
Your browser does not support the video tag.