Browse
Search
2025-106-E-AMS-Tile Restoration -Apply Epic Urethane to Mulitple OC Facilitiy Floors
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-106-E-AMS-Tile Restoration -Apply Epic Urethane to Mulitple OC Facilitiy Floors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 1:08:54 PM
Creation date
3/20/2025 1:08:44 PM
Metadata
Fields
Template:
Contract
Date
3/7/2025
Contract Starting Date
3/7/2025
Contract Ending Date
3/11/2025
Contract Document Type
Contract
Amount
$11,230.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Corporate Office: 712 Summit Ave, Kinston, NC 28501 <br />South Carolina Office: 7001 St Andrews Road, #370, Columbia, SC 29212 <br /> Phone: 1-866-327-4600 Fax: 1-252-376-1452 <br /> <br />Freddy Brooks <br />Orange County Public Works <br />600 Highway 86 North Hillsborough <br />NC 27278 <br />Phone:919-245-2636 <br />Fax: 919-644-3043 <br />Email: fbrooks@orangecountync.gov <br />Date: 02/20/2025 <br />Rep: Brad Albritton <br />Cell: 252-916-2045 <br />Email: brada@tilerestorationinc.com <br />Quote for - Orange County Public Works West Office Building - Break Rooms and Custodial <br />Units Process Description of Area Price Per Unit Price <br />1 460 Ultra Durable <br />Epic Urethane <br />Labor and Materials to apply Epic Urethane <br />Coating to 019 EH Testing, 252 Break Room, <br />254 Custodial, 329 Break Room, 330 <br />Custodial <br /> <br />Pricing Includes: <br />Strip of existing finish <br />Prep for application of Epic Finish <br />Application of Epic Finish <br />$2,750.00 $2,750.00 <br />1 500 Resilient <br />Cleaning <br />Option 1 <br /> <br />Labor and Materials to clean rubber tile <br />floor in Break Room 012 <br /> <br />Pricing Includes: <br />Deep Cleaning <br />$935.00 $935.00 <br />1 460 Ultra Durable <br />Epic Urethane <br />Option 2 <br /> <br />Labor and Materials to apply Epic Urethane <br />Coating to Break Room 012 <br /> <br />Pricing Includes: <br />Strip of existing floor <br />Prep for application of Epic Finish <br />Application of Epic Finish <br />$1,445.00 $1,445.00 <br /> <br />**Sales and Use Tax Added to Approved Scope _ As Applicable** <br />**Pricing Based on Single Mobilization** <br /> <br />***Excludes Floor Protection*** <br />***Excludes Temporary barriers or Barricades*** <br /> <br />50 % o f Pr opo sa l D ue B ef or e W or k is Sc he d u led Deposit Due:$0.00 <br />Sales and Use Tax:$0.00 <br />Material Tax : <br />Te r m s: N e t 20 Da y s Total:$0.00 <br /> <br />Docusign Envelope ID: 92B68706-E79A-4028-AD2D-D6CA78DCB231
The URL can be used to link to this page
Your browser does not support the video tag.