Browse
Search
Minutes 02-17-2025-Joint Meeting w Hillsborough
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2025
>
Minutes 02-17-2025-Joint Meeting w Hillsborough
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 10:27:25 AM
Creation date
3/20/2025 10:25:12 AM
Metadata
Fields
Template:
BOCC
Date
2/17/2025
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Abstract for Joint Meeting Discussion Items
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-17-2025 Joint Meeting with the Hillsborough Board of Commissioners
Agenda for February 17, 2025 Joint Meeting with Hillsborough Board of Commissioners
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-17-2025 Joint Meeting with the Hillsborough Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> Slide #13 <br /> Development Constraints and Variables <br /> • Parking <br /> • Residential uses require 1.4-2 parking spaces per unit, commercial uses <br /> requirements vary by use <br /> • Parking spaces require 270-300 sf of space each,exclusive of drive aisles and <br /> buffers—lots of new impervious surface <br /> • Structured parking yields more parking per acre, but costs significantly more <br /> ($28k/space for structured parking vs. $2,500 for surface parking) <br /> • Opportunities for shared parking in new development exists, but there are a lot <br /> of potential uses (train station,transit hub, residential, commercial, etc.)— <br /> some may have complimentary high-use times, others may conflict <br /> • Potential RTP Train Station could mean significantly more parking needed <br /> Slide #14 <br /> Development Constraints and Variables <br /> • Utilities <br /> • Depending on the mix of uses, some water and sewer capacity constraints may <br /> exist that limit the size and scope of development <br /> • Stormwater—on-site treatment and containment may take up a significant <br /> portion of developable property <br /> • Infrastructure <br /> • Depending on disposition of property,town may be on the hook for site <br /> preparation, street network, etc. <br /> • Disposition Method <br /> • Open sale, RFP for master developer or site developers,ground lease, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.