Browse
Search
Minutes 02-17-2025-Joint Meeting w Hillsborough
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2025
>
Minutes 02-17-2025-Joint Meeting w Hillsborough
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 10:27:25 AM
Creation date
3/20/2025 10:25:12 AM
Metadata
Fields
Template:
BOCC
Date
2/17/2025
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Abstract for Joint Meeting Discussion Items
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-17-2025 Joint Meeting with the Hillsborough Board of Commissioners
Agenda for February 17, 2025 Joint Meeting with Hillsborough Board of Commissioners
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-17-2025 Joint Meeting with the Hillsborough Board of Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> Slide #3 <br /> Project Background <br /> Approximately 19.6 acres of town-owned property <br /> between railroad tracks and Gold Hill Way/Orange <br /> Grove Ext. <br /> • Primary use of site is for construction of train station, <br /> but remaining property will be available for the town �y►•: <br /> for additional complementary development <br /> • Comprehensive Sustainability Plan goal is to set aside <br /> 1/3 of remaining site for affordable housing(about 5 <br /> acres) <br /> ` _ <br /> Stephanie Trueblood said there are several current transportation projects in the vicinity <br /> of the proposed train station. She listed the following projects: <br /> • 1-85 widening <br /> • Reworking of interchanges at 1-85 and old 86 <br /> • South Churton Street multi-modal plan, including widening <br /> Possibility of connecting old 86 to new 86 via Valley Forge Road <br /> • Hwy 70 multi-modal study <br /> • Rail re-alignment project to straighten curves in rail line <br /> Slide #4 <br /> Project Background <br /> • Train Station development ==i <br /> plan covers approximately <br /> 4.7 acresWY <br /> • Station will be about 8,000 ;y; ; I10 <br /> sqft and include town offices <br /> and meeting space -•• <br /> C� <br />
The URL can be used to link to this page
Your browser does not support the video tag.