Orange County NC Website
15 <br /> Slide #2 <br /> Topics <br /> • Town Water & Sewer Capacity Constraints and Updates <br /> • Town and County Land Use Planning Updates <br /> Slide #3 <br /> Water & Sewer Capacity Status = " <br /> • Reported to Town Board on sewer capacity in Mar.and <br /> Aug. 2021, Nov. 2022,Jan. 2025 <br /> • Projection through 2040 — <br /> Projects based upon water capacity spreadsheet provided by planning <br /> department—committed and potential y <br /> • River basin is capacity constrained due to wet weather " <br /> • Monitor Elizabeth Brady basin <br /> • Other smaller pumping stations projected capacity concerns »• A <br /> • Currently working on water system capacity modeling <br /> • Currently evaluating long term wastewater options — _ <br />