Browse
Search
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 03-18-2025 Business Meeting
>
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:38:43 AM
Creation date
3/13/2025 11:39:34 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 03-18-2025 Business Meeting
ORD-2025-008-Fiscal Year 2024-25 Budget Amendment #7
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-009-Orange Grove Road Sidewalk Professional Engineering Services Contract and Approval of Budget Amendment 7-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-017- Eno Arts Mill Suite 27 Lease Amendment
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-018-Orange Grove Road Sidewalk Professional Engineering Services Contract and approval of budget amendment 7-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-019-Construction Contract Award for Piedmont Food Processing Center Heating,Ventilation, and Air Conditioning Replacement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-020-Approval of Letter to the County’s US Congressional Delegation
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-006- Child Abuse Prevention Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> to discrimination. <br /> f. If activities related to the performance of this Agreement require specific licenses, <br /> certifications, or related credentials Contractor represents that it and its employees, agents and <br /> subcontractors engaged in such activities possess such licenses, certifications, or credentials <br /> and that such licenses certifications, or credentials are current, active, and not in a state of <br /> suspension or revocation. <br /> g. The Contractor shall supervise and direct the Work efficiently and with the Contractor's best <br /> skill and attention. Except as specifically set forth in the Contract Documents the Contractor <br /> shall be solely responsible for the means, methods, techniques, sequences, and procedures of <br /> construction, and for safety precautions and programs in connection with the Work. The <br /> Contractor shall be responsible to see that the finished Work complies accurately with the <br /> Contract Documents. <br /> h. The Contractor shall appoint a competent Project Manager with general authority to manage <br /> the Project for the Contractor. The Contractor shall also keep on the Project at all times during <br /> the Work of the Contractor a competent Resident Superintendent and necessary assistants who <br /> shall not be replaced without prior written approval by the Designer or by the Owner if a <br /> Designer is not retained for the Project. <br /> i. If, in the opinion of the Designer, any Subcontractor on the Project is incompetent or otherwise <br /> unsatisfactory, such Subcontractor shall be replaced by the Contractor with no increase in the <br /> Contract Price if and when directed by the Designer. <br /> j. The Contractor shall attend all progress conferences and all other meetings or conferences. <br /> The Contractor shall be represented at these progress conferences by a representative having <br /> the authority of the Project Manager and by such other representatives as the Designer may <br /> direct. <br /> k. Costs and expenses of providing samples for and assistance in any testing shall be borne by the <br /> Contractor. Any Work in which untested materials are used without written approval or <br /> written permission of the Owner or Designer shall be removed and replaced at Contractor's <br /> expense. <br /> 1. The Contractor shall obtain all necessary permits including all permits required to complete the <br /> Work in compliance with local, state, and federal law. <br /> 5. PAYMENT & TAXES <br /> a. The Owner hereby agrees to pay to the Contractor for the faithful performance of this <br /> Agreement, and the Contractor hereby agrees to perform all of the Work for a sum not-to- <br /> exceed Three Hundred Seventy Five Thousand Dollars ($375,000.00). Not later than the fifth <br /> (5th) day of each calendar month the Contractor shall submit to the Owner's Representative, <br /> generally the Designer if a Designer is retained on the Work, a Request for Payment for work <br /> done during the previous calendar month. <br /> (i) The Request for Payment shall be in form of a standardized invoice or AIA Document <br /> G702-703 appropriately addressed to Owner's Representative at Progressive Design <br /> Revised 01/24 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.