Browse
Search
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 03-18-2025 Business Meeting
>
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:38:43 AM
Creation date
3/13/2025 11:39:34 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 18, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 03-18-2025 Business Meeting
Minutes 03-18-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-008-Fiscal Year 2024-25 Budget Amendment #7
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-009-Orange Grove Road Sidewalk Professional Engineering Services Contract and Approval of Budget Amendment 7-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-017- Eno Arts Mill Suite 27 Lease Amendment
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-018-Orange Grove Road Sidewalk Professional Engineering Services Contract and approval of budget amendment 7-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-019-Construction Contract Award for Piedmont Food Processing Center Heating,Ventilation, and Air Conditioning Replacement
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-020-Approval of Letter to the County’s US Congressional Delegation
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-006- Child Abuse Prevention Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Thank you for choosing Brady as your HVAC support partner. We are committed to working with you to ensure your <br /> building serves the needs of your organization. We appreciate the opportunity to provide you with a proposal for your <br /> equipment replacement as detailed in the following pages. This proposal is based on our site visit and information <br /> provided by the owner for the installation of the new equipment. Any revision or request of change to scope of work by the <br /> owner at a later date would be subject to price review at that time. <br /> Packaged Units Scope Of Work <br /> Equipment Demolition, Installation and Specification <br /> Brady will disconnect all power wiring and control wiring as needed for the complete <br /> removal and disposal of the existing Trane packaged unit. <br /> Brady will include all labor, accessories, tool, equipment, and materials required to <br /> completely execute the installation of a new Trane packaged units. <br /> Unit specifications are listed Below; <br /> • AC-2, AC-4 7.5Ton Package Units (2) Units <br /> High Efficiency Packaged Rooftop with DX Cooling and Natural Gas Heat <br /> 0-100% Economizer with Dry Bulb control and Barometric Relief <br /> Hinged Access Panels <br /> 2-in MERV 13 Filters <br /> Modulating Hot Gas Reheat(HGRH) <br /> Stainless Steel Drain Pan <br /> Stainless Steel Gas Heat Exchanger <br /> Humidity wall mounted sensor(Field Installed) <br /> Pivot Smart Thermostat-Electromechanical (Field Installed) <br /> • AC-1, AC-3, AC-5 , AC-6 3Ton Package Units (4) Units <br /> High Efficiency Packaged Rooftop with DX Cooling and Natural Gas Heat <br /> 0-100% Dry bulb economizer(Field Installed) <br /> Barometric relief(Field Installed) <br /> Hinged panels <br /> 2 in pleated filters MERV 13 <br /> Condenser coil hail guard <br /> Dehumidification-hot gas reheat <br /> Stainless steel drain pan <br /> Stainless Steel Gas Heat Exchanger <br /> Humidity wall mounted sensor(Field Installed) <br /> Pivot Smart Thermostat-Electomechanical <br /> Page 3 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.