Browse
Search
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 03-18-2025 Business Meeting
>
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:38:43 AM
Creation date
3/13/2025 11:32:35 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 03-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> [Departmental Use Only] <br /> TITLE PFPC HVAC Replace <br /> FY 2024-2025 RFP RC2022-1001 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called"Agreement"),made as of the 19th day of <br /> March, 2025, by and between Brady Trane Services, Inc, (hereinafter called the "Contractor"), and Orange <br /> County, a political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange <br /> County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Progressive Design Collaborative, LTD (Sheet G1.01, <br /> M0.00, M1.01, M2.01, M5.01, M5.02, M7.01, E0.00, E1.01, E2.01, E5.01, E5.02, E6.01 dated <br /> May 28, 2024) <br /> b. Written specifications prepared by the Designer. <br /> c. Brady Trane Services, Inc. proposal dated February 13, 2025 which fully describes the work <br /> Revised 01/24 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.